IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0308 # 01 Y:1998 01 1998 MINIMIZE WATER USAGE $5,055 $4,900 Not Implemented
ND0308 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,614 $36,601 Not Implemented
ND0308 # 03 Y:1998 03 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,546 $10,000 Not Implemented
ND0308 # 04 Y:1998 04 1998 DISCONNECT BALLASTS $1,286 $1,320 Not Implemented
ND0308 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $772 $450 Not Implemented
ND0308 # 06 Y:1998 06 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $419 $50 Not Implemented
ND0308 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $327 $750 Not Implemented
ND0308 # 08 Y:1998 08 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $265 $338 Not Implemented
NV0108 # 01 Y:1998 01 1998 INSULATE BARE EQUIPMENT $1,042 $768 Not Implemented
NV0108 # 02 Y:1998 02 1998 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $11,472 $15,808 Implemented
NV0108 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $259 $0 Implemented
NV0108 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,992 $350 Implemented
NV0108 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $148 $252 Not Implemented
NV0108 # 06 Y:1998 06 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $794 $220 Implemented
MA0414 # 01 Y:1998 01 1998 MOVE BOILER TO MORE EFFICIENT LOCATION $64,705 $204,550 Not Implemented
MA0414 # 02 Y:1998 02 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,670 $12,451 Implemented
MA0414 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,293 $12,457 Not Implemented
MA0414 # 04 Y:1998 04 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $1,405 $453 Implemented
MA0414 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,508 $23,028 Implemented
MA0414 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $21,122 $50,000 Not Implemented
MA0414 # 07 Y:1998 07 1998 INSTALL OCCUPANCY SENSORS $1,182 $910 Implemented
MA0414 # 08 Y:1998 08 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $117,280 $1,000,000 Not Implemented
MA0415 # 01 Y:1998 01 1998 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $47,834 $5,100 Not Implemented
MA0415 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $53,137 $200,000 Not Implemented
MA0415 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $62,915 $200,000 Not Implemented