IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0126 # 02 Y:2007 02 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,647 $21,248 Implemented
IC0126 # 03 Y:2007 03 2007 USE OPTIMUM THICKNESS INSULATION $5,113 $2,715 Implemented
IC0126 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $1,467 $0 Not Implemented
IC0126 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,123 $1,575 Implemented
IC0126 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $609 $800 Implemented
IC0126 # 07 Y:2007 07 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $59,636 $0 Implemented
OR0516 # 01 Y:2007 01 2007 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $5,800 $0 Not Implemented
OR0516 # 02 Y:2007 02 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,100 $37,100 Implemented
OR0516 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,600 $15,300 Implemented
OR0516 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $5,300 $7,800 Implemented
OR0516 # 05 Y:2007 05 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,400 $9,800 Implemented
OR0516 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $2,800 $13,200 Not Implemented
OR0516 # 07 Y:2007 07 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,300 $26,900 Not Implemented
LL0273 # 01 Y:2007 01 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $37,538 $74,520 Implemented
LL0273 # 02 Y:2007 02 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,733 $357 Implemented
LL0273 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,583 $1,225 Not Implemented
LL0273 # 04 Y:2007 04 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $715 $345 Implemented
LL0273 # 05 Y:2007 05 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $313 $623 Not Implemented
LL0273 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $59 $60 Not Implemented
LL0273 # 07 Y:2007 07 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,340 $1,318 Not Implemented
AM0529 # 01 Y:2007 01 2007 INSTALL HYDROGEN FUEL CELL $59,020 $250,000 Not Implemented
AM0529 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $41,500 $86,400 Implemented
AM0529 # 03 Y:2007 03 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $18,360 $8,240 Not Implemented
AM0529 # 04 Y:2007 04 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $3,210 $52,600 Not Implemented
AM0529 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,110 $2,165 Implemented