Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AR0185 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,559 | $260 | Implemented |
AR0185 # 02 Y:2000 | 02 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,930 | $0 | Not Implemented |
AR0185 # 03 Y:2000 | 03 | 2000 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $16,446 | $15,663 | Implemented |
AR0185 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $768 | $300 | Not Implemented |
AR0185 # 05 Y:2000 | 05 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,764 | $0 | Not Implemented |
AR0185 # 06 Y:2000 | 06 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $21,267 | $59,881 | Not Implemented |
AR0185 # 07 Y:2000 | 07 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $464,750 | $385,000 | Not Implemented |
WI0380 # 01 Y:2000 | 01 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $44,625 | $68,300 | Not Implemented |
WI0380 # 02 Y:2000 | 02 | 2000 | AUTOMATE FINISHING PROCESS | $22,313 | $2,000 | Not Implemented |
WI0380 # 03 Y:2000 | 03 | 2000 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $6,415 | $25,000 | Not Implemented |
WI0380 # 04 Y:2000 | 04 | 2000 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $3,068 | $6,000 | Not Implemented |
WI0380 # 05 Y:2000 | 05 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $576 | $0 | Not Implemented |
WI0380 # 06 Y:2000 | 06 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,960 | $0 | Not Implemented |
WI0380 # 07 Y:2000 | 07 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $1,671 | $0 | Not Implemented |
WI0380 # 08 Y:2000 | 08 | 2000 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $1,159 | $1,000 | Not Implemented |
WI0380 # 09 Y:2000 | 09 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $845 | $1,000 | Not Implemented |
WI0380 # 10 Y:2000 | 10 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $532 | $0 | Not Implemented |
WI0380 # 11 Y:2000 | 11 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $214 | $1,020 | Not Implemented |
ND0353 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,237 | $10,801 | Implemented |
ND0353 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $573 | $600 | Not Implemented |
ND0353 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,205 | $11,337 | Implemented |
ND0353 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,489 | $300 | Implemented |
ND0353 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,107 | $140 | Implemented |
ND0353 # 06 Y:2000 | 06 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $1,117 | $1,714 | Implemented |
ND0353 # 07 Y:2000 | 07 | 2000 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,286 | $8,120 | Not Implemented |