IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0185 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,559 $260 Implemented
AR0185 # 02 Y:2000 02 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,930 $0 Not Implemented
AR0185 # 03 Y:2000 03 2000 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $16,446 $15,663 Implemented
AR0185 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $768 $300 Not Implemented
AR0185 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,764 $0 Not Implemented
AR0185 # 06 Y:2000 06 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $21,267 $59,881 Not Implemented
AR0185 # 07 Y:2000 07 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $464,750 $385,000 Not Implemented
WI0380 # 01 Y:2000 01 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $44,625 $68,300 Not Implemented
WI0380 # 02 Y:2000 02 2000 AUTOMATE FINISHING PROCESS $22,313 $2,000 Not Implemented
WI0380 # 03 Y:2000 03 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $6,415 $25,000 Not Implemented
WI0380 # 04 Y:2000 04 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,068 $6,000 Not Implemented
WI0380 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $576 $0 Not Implemented
WI0380 # 06 Y:2000 06 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,960 $0 Not Implemented
WI0380 # 07 Y:2000 07 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $1,671 $0 Not Implemented
WI0380 # 08 Y:2000 08 2000 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $1,159 $1,000 Not Implemented
WI0380 # 09 Y:2000 09 2000 RECOVER WASTE HEAT FROM EQUIPMENT $845 $1,000 Not Implemented
WI0380 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $532 $0 Not Implemented
WI0380 # 11 Y:2000 11 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $214 $1,020 Not Implemented
ND0353 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,237 $10,801 Implemented
ND0353 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $573 $600 Not Implemented
ND0353 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,205 $11,337 Implemented
ND0353 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,489 $300 Implemented
ND0353 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,107 $140 Implemented
ND0353 # 06 Y:2000 06 2000 DEVELOP A REPAIR/REPLACE POLICY $1,117 $1,714 Implemented
ND0353 # 07 Y:2000 07 2000 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,286 $8,120 Not Implemented