Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0505 # 06 Y:2002 | 06 | 2002 | USE OPTIMUM THICKNESS INSULATION | $1,260 | $2,500 | Not Implemented |
CO0505 # 07 Y:2002 | 07 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $770 | $60 | Implemented |
LL0144 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,063 | $2,340 | Implemented |
LL0144 # 02 Y:2002 | 02 | 2002 | INSULATE BARE EQUIPMENT | $8,581 | $4,711 | Not Implemented |
LL0144 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $1,206 | $361 | Not Implemented |
LL0144 # 04 Y:2002 | 04 | 2002 | INSULATE BARE EQUIPMENT | $807 | $322 | Implemented |
LL0144 # 05 Y:2002 | 05 | 2002 | USE PHOTOCELL CONTROLS | $242 | $104 | Implemented |
MI0043 # 01 Y:2002 | 01 | 2002 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $50,836 | $17,690 | Not Implemented |
MI0043 # 02 Y:2002 | 02 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $16,945 | $250 | Not Implemented |
MI0043 # 03 Y:2002 | 03 | 2002 | IMPROVE SPACE COMFORT CONDITIONING | $3,500 | $2,000 | Implemented |
MI0043 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,637 | $5,036 | Not Implemented |
MI0043 # 05 Y:2002 | 05 | 2002 | METER WASTE WATER | $1,102 | $1,454 | Not Implemented |
BD0213 # 01 Y:2002 | 01 | 2002 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $40,151 | $138,000 | Not Implemented |
BD0213 # 02 Y:2002 | 02 | 2002 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $29,490 | $10,000 | Implemented |
BD0213 # 03 Y:2002 | 03 | 2002 | INSTALL AUTOMATIC STACK DAMPER | $12,416 | $15,000 | Not Implemented |
BD0213 # 04 Y:2002 | 04 | 2002 | INSTALL TURBULATORS | $3,780 | $2,194 | Not Implemented |
BD0213 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,926 | $0 | Implemented |
BD0213 # 06 Y:2002 | 06 | 2002 | INSTALL SKYLIGHTS | $2,793 | $11,150 | Implemented |
BD0213 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $1,056 | $600 | Implemented |
BD0213 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $349 | $352 | Not Implemented |
BD0213 # 09 Y:2002 | 09 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $170 | $400 | Implemented |
BD0213 # 10 Y:2002 | 10 | 2002 | MINIMIZE WATER USAGE | $2,041 | $1,840 | Not Implemented |
BD0213 # 11 Y:2002 | 11 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $15,100 | $18,000 | Not Implemented |
BD0213 # 12 Y:2002 | 12 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,600 | $155 | Not Implemented |
LL0143 # 01 Y:2002 | 01 | 2002 | OPTIMIZE PLANT POWER FACTOR | $20,004 | $29,820 | Implemented |