IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0505 # 06 Y:2002 06 2002 USE OPTIMUM THICKNESS INSULATION $1,260 $2,500 Not Implemented
CO0505 # 07 Y:2002 07 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $770 $60 Implemented
LL0144 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,063 $2,340 Implemented
LL0144 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $8,581 $4,711 Not Implemented
LL0144 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,206 $361 Not Implemented
LL0144 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $807 $322 Implemented
LL0144 # 05 Y:2002 05 2002 USE PHOTOCELL CONTROLS $242 $104 Implemented
MI0043 # 01 Y:2002 01 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $50,836 $17,690 Not Implemented
MI0043 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,945 $250 Not Implemented
MI0043 # 03 Y:2002 03 2002 IMPROVE SPACE COMFORT CONDITIONING $3,500 $2,000 Implemented
MI0043 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,637 $5,036 Not Implemented
MI0043 # 05 Y:2002 05 2002 METER WASTE WATER $1,102 $1,454 Not Implemented
BD0213 # 01 Y:2002 01 2002 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $40,151 $138,000 Not Implemented
BD0213 # 02 Y:2002 02 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $29,490 $10,000 Implemented
BD0213 # 03 Y:2002 03 2002 INSTALL AUTOMATIC STACK DAMPER $12,416 $15,000 Not Implemented
BD0213 # 04 Y:2002 04 2002 INSTALL TURBULATORS $3,780 $2,194 Not Implemented
BD0213 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,926 $0 Implemented
BD0213 # 06 Y:2002 06 2002 INSTALL SKYLIGHTS $2,793 $11,150 Implemented
BD0213 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $1,056 $600 Implemented
BD0213 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $352 Not Implemented
BD0213 # 09 Y:2002 09 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $170 $400 Implemented
BD0213 # 10 Y:2002 10 2002 MINIMIZE WATER USAGE $2,041 $1,840 Not Implemented
BD0213 # 11 Y:2002 11 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $15,100 $18,000 Not Implemented
BD0213 # 12 Y:2002 12 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,600 $155 Not Implemented
LL0143 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $20,004 $29,820 Implemented