IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0513 # 14 Y:2014 14 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $9,159 $5,600 Not Implemented
NC0513 # 15 Y:2014 15 2014 KEEP BOILER TUBES CLEAN $13,546 $500 Not Implemented
NC0513 # 16 Y:2014 16 2014 INSULATE FEEDWATER TANK $438 $257 Implemented
NC0513 # 17 Y:2014 17 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $20,435 $19,607 Not Implemented
NC0513 # 18 Y:2014 18 2014 RECOVER WASTE HEAT FROM EQUIPMENT $9,375 $37,264 Not Implemented
WV0488 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,665 $9,243 Implemented
WV0488 # 02 Y:2014 02 2014 USE RADIANT HEATER FOR SPOT HEATING $2,722 $6,898 Not Implemented
WV0488 # 03 Y:2014 03 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,735 $214 Implemented
WV0488 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,681 $1,893 Implemented
WV0488 # 05 Y:2014 05 2014 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,558 $4,320 Not Implemented
WV0488 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,203 $1,160 Not Implemented
WV0488 # 07 Y:2014 07 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,003 $1,000 Implemented
WV0488 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $901 $16 Not Implemented
WV0488 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $571 $120 Implemented
WV0488 # 10 Y:2014 10 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $444 $320 Implemented
WV0488 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $327 $221 Implemented
WV0488 # 12 Y:2014 12 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $134 $150 Not Implemented
TT0132 # 01 Y:2014 01 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $12,064 $20,731 Implemented
TT0132 # 02 Y:2014 02 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $13,762 $17,000 Not Implemented
TT0132 # 03 Y:2014 03 2014 OPTIMIZE PLANT POWER FACTOR $21,103 $6,000 Not Implemented
TT0132 # 04 Y:2014 04 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,713 $25,000 Implemented
TT0132 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $894 $1,750 Not Implemented
TT0132 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,643 $0 Not Implemented
TT0132 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,145 $7,000 Not Implemented
TT0132 # 08 Y:2014 08 2014 INSTALL COMMON HEADER ON COMPRESSORS $3,556 $12,000 Not Implemented