Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0513
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2014
Principal Product Wool yarn and fabric
NAICS 313210 - Broadwoven Fabric Mills
SIC 2231 - Broadwoven Fabric Mills, Wool
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 647,000
Annual Production 9,000,000 Pounds
Production Hrs. Annual 4,800
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,431,745 32,044,344 kWh $0.04
Electricity Demand $1,005,509 89,199 kW-months/year $11.27
Natural Gas $1,055,091 202,600 MMBtu $5.21
TOTAL ENERGY COSTS $3,492,345
RECOMMENDED SAVINGS* $456,571 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $368,430
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$137,290
Cost:
$454,945
$84,211 1,883,905 $53,079 4,710 - - - - - - $84,211
1,883,905
kWh
$53,079
4,710
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$89,082
Cost:
$860
$54,641 1,222,397 $34,441 3,056 - - - - - - $54,641
1,222,397
kWh
$34,441
3,056
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$21,458
Cost:
$10,000
$10,639 238,007 $10,819 960 - - - - - - $10,639
238,007
kWh
$10,819
960
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,428
Cost:
$100
$4,642 103,843 $2,926 260 - - $(-900) - $(-240) - $4,642
103,843
kWh
$2,926
260
kW-months/year
-
-
MMBtu
$(-900)
-
$
$(-240)
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$325
Cost:
$175
$325 7,281 - - - - - - - - $325
7,281
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34,462
Cost:
$24,205
$21,138 472,896 $13,324 1,182 - - - - - - $21,138
472,896
kWh
$13,324
1,182
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,117
Cost:
$325
$611 13,680 $386 35 - - - - $120 - $611
13,680
kWh
$386
35
kW-months/year
-
-
MMBtu
-
-
$
$120
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,462
Cost:
$3,470
$3,462 77,488 - - - - - - - - $3,462
77,488
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$835
Cost:
$240
$287 6,413 $99 9 - - - - $449 - $287
6,413
kWh
$99
9
kW-months/year
-
-
MMBtu
-
-
$
$449
-
$
10: 2.7134 USE PHOTOCELL CONTROLS Savings:
$47
Cost:
$80
$47 1,056 - - - - - - - - $47
1,056
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$48,265
Cost:
$15,000
- - - - $48,265 9,234 - - - - -
-
kWh
-
-
kW-months/year
$48,265
9,234
MMBtu
-
-
$
-
-
$
12: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$40,007
Cost:
$6,200
- - - - $52,777 10,130 $(-1,250) - $(-11,520) - -
-
kWh
-
-
kW-months/year
$52,777
10,130
MMBtu
$(-1,250)
-
$
$(-11,520)
-
$
13: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$20,840
Cost:
$20,000
- - - - $20,840 4,000 - - - - -
-
kWh
-
-
kW-months/year
$20,840
4,000
MMBtu
-
-
$
-
-
$
14: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$9,159
Cost:
$5,600
- - - - $9,159 1,758 - - - - -
-
kWh
-
-
kW-months/year
$9,159
1,758
MMBtu
-
-
$
-
-
$
15: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$13,546
Cost:
$500
- - - - $13,546 2,600 - - - - -
-
kWh
-
-
kW-months/year
$13,546
2,600
MMBtu
-
-
$
-
-
$
16: 2.2123 INSULATE FEEDWATER TANK Savings:
$438
Cost:
$257
- - - - $438 84 - - - - -
-
kWh
-
-
kW-months/year
$438
84
MMBtu
-
-
$
-
-
$
17: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$20,435
Cost:
$19,607
- - - - $20,435 3,922 - - - - -
-
kWh
-
-
kW-months/year
$20,435
3,922
MMBtu
-
-
$
-
-
$
18: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,375
Cost:
$37,264
- - - - $9,375 1,800 - - - - -
-
kWh
-
-
kW-months/year
$9,375
1,800
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$456,571
Cost:
$598,828
$180,003 4,026,966 $115,074 10,212 $174,835 33,528 $(-2,150) - $(-11,191) - $180,003
4,026,966
kWh
$115,074
10,212
kW-months/year
$174,835
33,528
MMBtu
$(-2,150)
-
$
$(-11,191)
-
$
TOTAL IMPLEMENTED Savings:
$368,430
Cost:
$511,247
$158,207 3,539,334 $101,364 8,995 $122,320 23,448 $(-2,150) - $(-11,311) - $158,207
3,539,334
kWh
$101,364
8,995
kW-months/year
$122,320
23,448
MMBtu
$(-2,150)
-
$
$(-11,311)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost