IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1801 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,263 $2,190 Implemented
UK1801 # 06 Y:2018 06 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $860 $1,250 Implemented
UK1801 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $8,475 $2,977 Not Implemented
UK1801 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $3,719 $1,526 Not Implemented
UK1801 # 09 Y:2018 09 2018 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,865 $5,895 Not Implemented
UK1801 # 10 Y:2018 10 2018 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,756 $5,475 Not Implemented
UK1801 # 11 Y:2018 11 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,054 $0 Not Implemented
LS1803 # 01 Y:2018 01 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $544 $220 Implemented
LS1803 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $437 $300 Not Implemented
LS1803 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $179 $156 Not Implemented
LS1803 # 04 Y:2018 04 2018 ELIMINATE/REDUCE AN OPERATION $600 $620 Not Implemented
LS1803 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $39 $95 Not Implemented
LS1803 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $577 $2,755 Implemented
LS1803 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $228 $1,800 Not Implemented
BS0109 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,601 $1,491 Not Implemented
BS0109 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $78,480 $10,867 Not Implemented
BS0109 # 03 Y:2018 03 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,902 $6,720 Not Implemented
BS0109 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $122 $39 Not Implemented
BS0109 # 05 Y:2018 05 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $169 $25 Not Implemented
OK0986 # 01 Y:2018 01 2018 REPAIR AND ELIMINATE STEAM LEAKS $107,913 $4,800 Implemented
OK0986 # 02 Y:2018 02 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,456 $4,000 Implemented
OK0986 # 03 Y:2018 03 2018 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $698 $356 Not Implemented
OK0986 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,941 $16,934 Implemented
OK0986 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $552 $1,402 Implemented
OK0986 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $893 $6,038 Implemented