IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,111

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0019 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $585 $0 n/a
SJ0019 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,572 $10,571 n/a
SJ0019 # 05 Y:2024 05 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $253 $332 n/a
SJ0019 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,178 $54 n/a
SJ0019 # 07 Y:2024 07 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $747 $6,433 n/a
SJ0019 # 08 Y:2024 08 2024 RECYCLE CASTING SAND $75,618 $775,000 n/a
SJ0019 # 09 Y:2024 09 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $760 $1,897 n/a
AM0913 # 01 Y:2024 01 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $206,260 $1,610,000 n/a
AM0913 # 02 Y:2024 02 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $430,200 $10,000 n/a
AM0913 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,970 $2,000 n/a
AM0913 # 04 Y:2024 04 2024 REPAIR OR REPLACE STEAM TRAPS $12,600 $2,200 n/a
AM0913 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $10,340 $19,040 n/a
AM0913 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,090 $0 n/a
AM0913 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,000 $15 n/a
AM0913 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $2,610 $415 n/a
AM0920 # 01 Y:2024 01 2024 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $903 $35,477 n/a
AM0920 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $20,630 $460,200 n/a
AM0920 # 03 Y:2024 03 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $6,640 $7,500 n/a
AM0920 # 04 Y:2024 04 2024 REPAIR FAULTY LOUVERS AND DAMPERS $4,125 $9,000 n/a
AM0920 # 05 Y:2024 05 2024 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,403 $1,000 n/a
UU0252 # 01 Y:2024 01 2024 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $19,754 $108,000 n/a
UU0252 # 02 Y:2024 02 2024 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $53,389 $212,000 n/a
UU0252 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $1,880 $5,500 n/a
UU0252 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $4,410 n/a
UU0253 # 01 Y:2024 01 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $26,630 $43,200 n/a