IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0391 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,800 $5,200 Implemented
TN0391 # 03 Y:1990 03 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,950 $1,800 Implemented
TN0391 # 04 Y:1990 04 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,420 $2,780 Implemented
TN0391 # 05 Y:1990 05 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $465 $3,000 Not Implemented
TN0391 # 06 Y:1990 06 1990 INSULATE BARE EQUIPMENT $1,421 $263 Not Implemented
TN0391 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $577 $350 Not Implemented
TN0391 # 08 Y:1990 08 1990 INSULATE BARE EQUIPMENT $360 $512 Implemented
TN0391 # 09 Y:1990 09 1990 OPTIMIZE PLANT POWER FACTOR $6,781 $25,000 Implemented
AM0080 # 01 Y:1990 01 1990 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,290 $3,400 Implemented
AM0080 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,600 $3,500 Not Implemented
AM0080 # 03 Y:1990 03 1990 PURCHASE EQUIPMENT INSTEAD OF LEASING $4,500 $3,500 Implemented
AM0080 # 04 Y:1990 04 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,480 $0 Implemented
AM0080 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $440 $1,010 Implemented
AM0080 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $940 Implemented
AM0080 # 07 Y:1990 07 1990 INSTALL TIMERS AND/OR THERMOSTATS $172 $225 Implemented
AM0080 # 08 Y:1990 08 1990 ADJUST VENTS TO MINIMIZE ENERGY USE $149 $0 Implemented
AM0081 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,096 $36,735 Implemented
AM0081 # 02 Y:1990 02 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,627 $8,575 Implemented
AM0081 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,400 $1,000 Implemented
AM0081 # 04 Y:1990 04 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,350 $0 Implemented
AM0081 # 05 Y:1990 05 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $545 $2,000 Not Implemented
AM0081 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $1,640 Implemented
AM0082 # 01 Y:1990 01 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,080 $14,110 Implemented
AM0082 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,360 $2,000 Implemented
AM0082 # 03 Y:1990 03 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,730 $12,000 Not Implemented