IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1040 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,152 $4,457 Implemented
UA0235 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,903 $5,078 Not Implemented
UA0235 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $16,096 $8,577 Not Implemented
UA0235 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,979 $2,094 Implemented
UA0235 # 04 Y:2021 04 2021 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,001 $808 Implemented
UA0235 # 05 Y:2021 05 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $26,697 $150 Implemented
UA0235 # 06 Y:2021 06 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,383 $708 Not Implemented
UA0235 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,137 $81 Implemented
AS0499 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,180 $1,532 Not Implemented
AS0499 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,118 $6,351 Implemented
AS0499 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,171 $63 Implemented
AS0499 # 04 Y:2021 04 2021 UPGRADE CONTROLS ON COMPRESSORS $848 $607 Not Implemented
AS0499 # 05 Y:2021 05 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $845 $2,880 Not Implemented
AS0499 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $624 $2,534 Not Implemented
AS0499 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $109 $394 Not Implemented
AS0499 # 08 Y:2021 08 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $97 $80 Not Implemented
AS0498 # 01 Y:2021 01 2021 COMBINE UTILITY METERS $25,997 $1,473 Implemented
AS0498 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,073 $11,543 Implemented
AS0498 # 03 Y:2021 03 2021 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,616 $453 Implemented
AS0498 # 04 Y:2021 04 2021 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $4,426 $15,525 Implemented
AS0498 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,328 $1,452 Implemented
UU0176 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $156,566 $187,200 Not Implemented
UU0176 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $94,747 $42,608 Implemented
UU0176 # 03 Y:2021 03 2021 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $29,753 $10,400 Implemented
UU0176 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $23,470 $21,270 Not Implemented