IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0057 # 08 Y:2003 08 2003 METER WASTE WATER $12,786 $1,950 Implemented
MI0057 # 09 Y:2003 09 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $250,000 $43,000 Not Implemented
MI0056 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $180,266 $2,000 Not Implemented
MI0056 # 02 Y:2003 02 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $281,112 $88,736 Implemented
MI0056 # 03 Y:2003 03 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,817 $4,301 Not Implemented
MI0056 # 04 Y:2003 04 2003 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $147,537 $25,000 Not Implemented
MI0056 # 05 Y:2003 05 2003 REPAIR OR REPLACE STEAM TRAPS $7,955 $904 Implemented
MI0056 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,054 $40,600 Implemented
MI0056 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $500,000 $43,000 Implemented
MI0056 # 08 Y:2003 08 2003 METER WASTE WATER $25,572 $1,950 Implemented
UF0320 # 01 Y:2003 01 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $25,707 $48,985 Implemented
UF0320 # 02 Y:2003 02 2003 INSTALL SKYLIGHTS $16,155 $67,591 Not Implemented
UF0320 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,161 $225 Implemented
UF0320 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $3,320 $3,000 Not Implemented
UF0320 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,604 $0 Not Implemented
UF0320 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,426 $28,971 Not Implemented
UF0320 # 07 Y:2003 07 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $70,120 $150,000 Not Implemented
UF0320 # 08 Y:2003 08 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,009 $4,000 Implemented
UF0320 # 09 Y:2003 09 2003 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $448,198 $37,200 Implemented
UF0319 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,379 $9,534 Implemented
UF0319 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $1,277 $825 Implemented
UF0319 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $3,600 $20,000 Not Implemented
UF0319 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,151 $17,945 Not Implemented
UF0319 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,620 $0 Implemented
UF0319 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,140 $52,700 Not Implemented