IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0286 # 05 Y:2023 05 2023 INSTALL STORM WINDOWS AND DOORS $619 $7,463 Not Implemented
IC0286 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $306 $388 Implemented
IC0286 # 07 Y:2023 07 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $254 $0 Implemented
IC0286 # 08 Y:2023 08 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,154 $4,776 Not Implemented
IC0286 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,267 $0 Not Implemented
IC0286 # 10 Y:2023 10 2023 REPLACE BOILER $2,240 $49,894 Not Implemented
WM0204 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $97 $240 Implemented
WM0204 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $571 $750 Implemented
WM0204 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $651 $1,001 Not Implemented
WM0204 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,440 $2,330 Implemented
WM0204 # 01 Y:2023 01 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $22,875 $1,950 Not Implemented
IC0284 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,480 $3,669 Implemented
IC0284 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,864 $0 Implemented
IC0284 # 03 Y:2023 03 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $445 $0 Implemented
IC0284 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $556 $897 Implemented
IC0284 # 05 Y:2023 05 2023 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $152,337 $14,315 Not Implemented
IC0284 # 06 Y:2023 06 2023 PURCHASE EQUIPMENT INSTEAD OF LEASING $192,600 $121,203 Implemented
IC0284 # 07 Y:2023 07 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $415 $0 Implemented
IC0284 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $190 $379 Implemented
IC0282 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,637 $3,994 Implemented
IC0282 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,144 $7,160 Implemented
IC0282 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,241 $4,067 Not Implemented
IC0282 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $132,518 $1,169,610 Not Implemented
IC0281 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,197 $3,250 Implemented
IC0281 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,536 $7,857 Implemented