IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0760 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,420 $4,344 Implemented
OR0760 # 03 Y:2023 03 2023 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $112,516 $735,625 Implemented
ORC005 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,739 $21,350 Not Implemented
ORC005 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,887 $2,000 Not Implemented
ORC005 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,949 $15,000 Not Implemented
OR0761 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,913 $1,078 Implemented
OR0761 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,934 $9,934 Implemented
OR0761 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,236 $26,406 Not Implemented
OR0761 # 04 Y:2022 04 2022 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $31,013 $150,000 Not Implemented
OR0758 # 01 Y:2022 01 2022 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $217,268 $1,015,000 Not Implemented
OR0758 # 02 Y:2022 02 2022 PAY UTILITY BILLS ON TIME $1,874 $0 Not Implemented
OR0758 # 03 Y:2022 03 2022 USE AUTOMATIC FLOW CONTROL $39,055 $90,000 Not Implemented
ORC004 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $390 Not Implemented
ORC004 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $127 $240 Not Implemented
ORC004 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $710 $1,200 Implemented
ORC004 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $774 $15,000 Not Implemented
ORC003 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,122 $37,260 Not Implemented
ORC003 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $683 $3,000 Not Implemented
ORC003 # 03 Y:2022 03 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,529 $72,976 Not Implemented
ORC003 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $759 $2,250 Not Implemented
ORC003 # 05 Y:2022 05 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $61 $300 Not Implemented
OR0757 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,612 $0 Not Implemented
OR0757 # 02 Y:2022 02 2022 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $26,900 $0 Not Implemented
OR0757 # 03 Y:2022 03 2022 INSTALL AUTOMATIC PACKING EQUIPMENT $97,200 $50,000 Not Implemented
OR0757 # 04 Y:2022 04 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $194,400 $300,000 Not Implemented