Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0760 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,420 | $4,344 | Implemented |
OR0760 # 03 Y:2023 | 03 | 2023 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $112,516 | $735,625 | Implemented |
ORC005 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,739 | $21,350 | Not Implemented |
ORC005 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $1,887 | $2,000 | Not Implemented |
ORC005 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $1,949 | $15,000 | Not Implemented |
OR0761 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,913 | $1,078 | Implemented |
OR0761 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,934 | $9,934 | Implemented |
OR0761 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $6,236 | $26,406 | Not Implemented |
OR0761 # 04 Y:2022 | 04 | 2022 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $31,013 | $150,000 | Not Implemented |
OR0758 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $217,268 | $1,015,000 | Not Implemented |
OR0758 # 02 Y:2022 | 02 | 2022 | PAY UTILITY BILLS ON TIME | $1,874 | $0 | Not Implemented |
OR0758 # 03 Y:2022 | 03 | 2022 | USE AUTOMATIC FLOW CONTROL | $39,055 | $90,000 | Not Implemented |
ORC004 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $126 | $390 | Not Implemented |
ORC004 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $127 | $240 | Not Implemented |
ORC004 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $710 | $1,200 | Implemented |
ORC004 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $774 | $15,000 | Not Implemented |
ORC003 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,122 | $37,260 | Not Implemented |
ORC003 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $683 | $3,000 | Not Implemented |
ORC003 # 03 Y:2022 | 03 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,529 | $72,976 | Not Implemented |
ORC003 # 04 Y:2022 | 04 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $759 | $2,250 | Not Implemented |
ORC003 # 05 Y:2022 | 05 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $61 | $300 | Not Implemented |
OR0757 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,612 | $0 | Not Implemented |
OR0757 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $26,900 | $0 | Not Implemented |
OR0757 # 03 Y:2022 | 03 | 2022 | INSTALL AUTOMATIC PACKING EQUIPMENT | $97,200 | $50,000 | Not Implemented |
OR0757 # 04 Y:2022 | 04 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $194,400 | $300,000 | Not Implemented |