IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0221 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,675 $25,694 Not Implemented
UU0221 # 05 Y:2023 05 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,589 $4,500 Implemented
UU0221 # 06 Y:2023 06 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $293 $1,410 Not Implemented
UU0221 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $280 $965 Not Implemented
UU0226 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,910 $800 Implemented
UU0226 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,162 $2,000 Implemented
UU0226 # 03 Y:2023 03 2023 USE OPTIMUM TEMPERATURE $2,090 $2,000 Implemented
UU0220 # 01 Y:2023 01 2023 USE HEAT PUMP FOR SPACE CONDITIONING $67,069 $0 Implemented
UU0220 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $3,986 $13,500 Implemented
UU0220 # 03 Y:2023 03 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,450 $3,366 Not Implemented
UU0220 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,245 $3,810 Not Implemented
UU0220 # 05 Y:2023 05 2023 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,160 $50 Implemented
UU0220 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $920 $1,200 Implemented
UU0219 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $242,311 $1,768,555 Not Implemented
UU0219 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,112 $13,345 Implemented
UU0219 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,350 $2,350 Not Implemented
UU0219 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,850 $18,236 Not Implemented
UU0219 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,272 $172 Not Implemented
UU0219 # 06 Y:2023 06 2023 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $1,035 $729 Not Implemented
UU0218 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $8,860 $4,445 Not Implemented
UU0218 # 02 Y:2023 02 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $7,404 $5,700 Implemented
UU0218 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,223 $53,198 Implemented
UU0218 # 04 Y:2023 04 2023 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $3,088 $3,300 Not Implemented
UU0218 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $2,944 $78,979 Not Implemented
UU0218 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,861 $721 Implemented