IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0486 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,174 $1,540 Implemented
LE0486 # 04 Y:2019 04 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $15,202 $21,000 Not Implemented
LE0486 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,256 $65,000 Not Implemented
LE0486 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,726 $7,400 Not Implemented
LE0486 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,558 $28,275 Implemented
OR0730 # 01 Y:2019 01 2019 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $15,651 $5,000 Not Implemented
OR0730 # 02 Y:2019 02 2019 MODIFY WORKLOAD $13,223 $18,824 Not Implemented
OR0730 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,201 $0 Not Implemented
OR0730 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $2,657 $9,364 Not Implemented
OR0730 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,030 $2,058 Not Implemented
NL0041 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $238,833 $700,000 Implemented
NL0041 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $10,636 $52,000 Implemented
NL0041 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,751 $600 Implemented
NL0041 # 04 Y:2019 04 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,670 $100 Implemented
NL0041 # 05 Y:2019 05 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5,000 $19,750 Implemented
NL0041 # 06 Y:2019 06 2019 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $2,618 $3,180 Not Implemented
NL0041 # 07 Y:2019 07 2019 REPAIR AND ELIMINATE STEAM LEAKS $2,123 $200 Implemented
NL0041 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197 $674 Implemented
TT0231 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,957 $153,710 Implemented
TT0231 # 02 Y:2019 02 2019 INSTALL COMMON HEADER ON COMPRESSORS $13,982 $1,050 Implemented
TT0231 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $4,149 $10,500 Implemented
TT0231 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $3,033 $25 Implemented
TT0231 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $886 $40 Implemented
TT0231 # 06 Y:2019 06 2019 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $650 $1,650 Implemented
OR0729 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $14,812 $38,672 Implemented