IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,738

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0025 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,649 $300 Implemented
AR0025 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,122 $1,456 Implemented
AR0025 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,184 $725 Implemented
AR0025 # 04 Y:1994 04 1994 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $107,965 $66,000 Not Implemented
AR0025 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,343 $9,530 Implemented
AR0025 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,863 $600 Implemented
AR0024 # 01 Y:1994 01 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,495 $210 Implemented
AR0024 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $798 $974 Implemented
AR0024 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,118 $1,349 Implemented
AR0024 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $154 $50 Implemented
AR0024 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,986 $0 Implemented
AR0024 # 06 Y:1994 06 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $724 $0 Implemented
AR0022 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,415 $5,110 Not Implemented
AR0022 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,133 $420 Not Implemented
AR0022 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,129 $2,544 Not Implemented
AR0022 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,867 $1,000 Not Implemented
AR0022 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $756 $243 Not Implemented
AR0023 # 01 Y:1994 01 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,012 $0 Implemented
AR0023 # 02 Y:1994 02 1994 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $101,949 $59,000 Not Implemented
AR0023 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $12,592 $20,205 Implemented
AR0023 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,010 $8,910 Implemented
AR0021 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,260 $6,000 Implemented
AR0021 # 02 Y:1994 02 1994 USE OPTIMUM THICKNESS INSULATION $855 $100 Implemented
AR0021 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $20,139 $9,600 Implemented
AR0021 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,558 $150 Implemented