IAC Assessment: AR0027
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0027
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1994
Principal Product Preserved Railroad Crossties
NAICS n/a
SIC 2491 - Wood Preserving
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 100,000
Annual Production 2,500,000 Pieces
Production Hrs. Annual 8,134
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $275,850 3,334,701 kWh $0.08
Natural Gas $272,440 99,934 MMBtu $2.73
TOTAL ENERGY COSTS $548,290
RECOMMENDED SAVINGS* $148,055 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $148,055
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$56,354
Cost:
$5,100
- - $56,354 20,643 -
-
kWh
$56,354
20,643
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,424
Cost:
$756
$2,424 29,308 - - $2,424
29,308
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,396
Cost:
$180
$2,396 29,015 - - $2,396
29,015
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,362
Cost:
$699
$1,362 16,413 - - $1,362
16,413
kWh
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$52,744
Cost:
$41,355
$52,744 - - - $52,744
-
kWh
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$10,636
Cost:
$2,021
- - $10,636 3,896 -
-
kWh
$10,636
3,896
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,289
Cost:
$2,750
$3,289 39,859 - - $3,289
39,859
kWh
-
-
MMBtu
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,724
Cost:
-
$7,724 - - - $7,724
-
kWh
-
-
MMBtu
09: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$4,040
Cost:
$100
- - $4,040 1,480 -
-
kWh
$4,040
1,480
MMBtu
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,086
Cost:
$11,543
- - $7,086 2,596 -
-
kWh
$7,086
2,596
MMBtu
TOTAL RECOMMENDED Savings:
$148,055
Cost:
$64,504
$69,939 114,595 $78,116 28,615 $69,939
114,595
kWh
$78,116
28,615
MMBtu
TOTAL IMPLEMENTED Savings:
$148,055
Cost:
$64,504
$69,939 114,595 $78,116 28,615 $69,939
114,595
kWh
$78,116
28,615
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas