Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,314
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0234 # 01 Y:1998 | 01 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $324 | $525 | Not Implemented |
AS0234 # 02 Y:1998 | 02 | 1998 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,398 | $4,425 | Not Implemented |
AS0234 # 03 Y:1998 | 03 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,384 | $60 | Implemented |
AS0234 # 04 Y:1998 | 04 | 1998 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $132,000 | $48,000 | Implemented |
AS0234 # 05 Y:1998 | 05 | 1998 | APPLY FOR INVESTMENT INCENTIVES | $900 | $60 | Not Implemented |
AS0234 # 06 Y:1998 | 06 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $83 | $100 | Not Implemented |
AS0234 # 07 Y:1998 | 07 | 1998 | MODIFY STARTUP/SHUTDOWN TIMES | $84 | $360 | Implemented |
AS0228 # 01 Y:1998 | 01 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $244,239 | $410,200 | Implemented |
AS0228 # 02 Y:1998 | 02 | 1998 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $955,252 | $4,000,000 | Not Implemented |
AS0228 # 03 Y:1998 | 03 | 1998 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $395,073 | $1,524,052 | Not Implemented |
AS0228 # 04 Y:1998 | 04 | 1998 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $17,372 | $80,000 | Not Implemented |
AS0228 # 05 Y:1998 | 05 | 1998 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $69,699 | $225,000 | Not Implemented |
AS0228 # 06 Y:1998 | 06 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $768 | $60 | Not Implemented |
AS0228 # 07 Y:1998 | 07 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,819 | $60 | Not Implemented |
AS0228 # 08 Y:1998 | 08 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $65,562 | $7,000 | Not Implemented |
AS0228 # 09 Y:1998 | 09 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $498,755 | $240 | Implemented |
AS0228 # 10 Y:1998 | 10 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,873 | $3,125 | Implemented |
AS0228 # 11 Y:1998 | 11 | 1998 | INSTALL EQUIPMENT TO MOVE PRODUCT | $11,311 | $14,500 | Not Implemented |
AS0233 # 01 Y:1998 | 01 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $508 | $220 | Not Implemented |
AS0233 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $524 | $60 | Not Implemented |
AS0233 # 03 Y:1998 | 03 | 1998 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $415 | $365 | Not Implemented |
AS0233 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,226 | $8,275 | Not Implemented |
AS0233 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $83 | $87 | Not Implemented |
AS0233 # 06 Y:1998 | 06 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $368 | $60 | Not Implemented |
AS0233 # 07 Y:1998 | 07 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $47,175 | $480 | Implemented |