IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0343 # 01 Y:1995 01 1995 ADD AREA LIGHTING SWITCHES $2,470 $300 Not Implemented
CO0343 # 02 Y:1995 02 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,910 $4,320 Not Implemented
CO0343 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,400 $5,210 Not Implemented
CO0343 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,180 $2,680 Implemented
CO0343 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $980 $900 Implemented
CO0343 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $930 $1,250 Implemented
CO0343 # 07 Y:1995 07 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $170 $0 Not Implemented
CO0342 # 01 Y:1995 01 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $96,090 $153,400 Not Implemented
CO0342 # 02 Y:1995 02 1995 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $56,560 $174,500 Not Implemented
CO0342 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,910 $13,270 Implemented
CO0342 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,190 $1,240 Implemented
CO0342 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $720 Not Implemented
CO0342 # 06 Y:1995 06 1995 RECOVER WASTE HEAT FROM EQUIPMENT $820 $600 Implemented
CO0342 # 07 Y:1995 07 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $530 $0 Implemented
CO0341 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,310 $16,550 Implemented
CO0341 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $830 $260 Implemented
CO0341 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $620 $650 Not Implemented
CO0341 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $260 Implemented
CO0341 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $250 $250 Implemented
CO0340 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,040 $1,990 Implemented
CO0340 # 02 Y:1995 02 1995 AIR CONDITION ONLY SPACE NECESSARY $3,580 $400 Implemented
CO0340 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,350 $3,820 Not Implemented
CO0340 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,090 $3,670 Implemented
CO0340 # 05 Y:1995 05 1995 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $410 $1,170 Not Implemented
CO0340 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $300 Not Implemented