IAC logo
IAC Assessment: CO0344
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0344
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1995
Principal Product Specialty bolts
NAICS n/a
SIC 3542 - Machine Tools, Metal Forming Types
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 30,000
Annual Production 1,170,000 Pounds
Production Hrs. Annual 4,368
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,933 710,434 kWh $0.08
Natural Gas $61,013 24,711 MMBtu $2.47
TOTAL ENERGY COSTS $121,306
RECOMMENDED SAVINGS* $41,300 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,300
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost
$ kWh $ MMBtu $ gal $ lb $ $
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$32,610
Cost:
$165,000
- - $32,610 13,179 - - - - - - -
-
kWh
$32,610
13,179
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$2,980
Cost:
$2,670
- - - - $3,360 216 $(-20) (-24) $(-360) - -
-
kWh
-
-
MMBtu
$3,360
216
gal
$(-20)
(-24)
lb
$(-360)
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,690
Cost:
$100
$1,690 24,326 - - - - - - - - $1,690
24,326
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,660
Cost:
$5,920
$1,660 21,981 - - - - - - - - $1,660
21,981
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,250
Cost:
$780
$1,250 17,878 - - - - - - - - $1,250
17,878
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,110
Cost:
$2,080
$1,110 17,878 - - - - - - - - $1,110
17,878
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$41,300
Cost:
$176,550
$5,710 82,063 $32,610 13,179 $3,360 216 $(-20) (-24) $(-360) - $5,710
82,063
kWh
$32,610
13,179
MMBtu
$3,360
216
gal
$(-20)
(-24)
lb
$(-360)
-
$
TOTAL IMPLEMENTED Savings:
$41,300
Cost:
$176,550
$5,710 82,063 $32,610 13,179 $3,360 216 $(-20) (-24) $(-360) - $5,710
82,063
kWh
$32,610
13,179
MMBtu
$3,360
216
gal
$(-20)
(-24)
lb
$(-360)
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ lb $ $
Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost