IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0016 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $858 $640 Implemented
CO0016 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $380 $300 Implemented
CO0016 # 05 Y:1985 05 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $121 $219 Not Implemented
CO0016 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $149 $170 Not Implemented
CO0016 # 07 Y:1985 07 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,046 $13,000 Implemented
CO0016 # 08 Y:1985 08 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $235 $200 Implemented
CO0016 # 09 Y:1985 09 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $7,666 $5,000 Not Implemented
CO0016 # 10 Y:1985 10 1985 INSTALL TURBULATORS $5,512 $1,000 Not Implemented
CO0016 # 11 Y:1985 11 1985 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,879 $2,500 Not Implemented
CO0017 # 01 Y:1985 01 1985 INSTALL SET-BACK TIMERS $2,302 $300 Implemented
CO0017 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,018 $100 Implemented
CO0017 # 03 Y:1985 03 1985 INSTALL TURBULATORS $518 $300 Not Implemented
CO0017 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $400 Not Implemented
CO0017 # 05 Y:1985 05 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,616 $2,800 Implemented
UD0148 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,111 $2,395 Implemented
UD0148 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $994 $1,560 Not Implemented
UD0149 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,221 $2,000 Implemented
UD0149 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,360 $0 Implemented
UD0149 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $765 $276 Implemented
UD0149 # 04 Y:1985 04 1985 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $332 $300 Implemented
UD0150 # 01 Y:1985 01 1985 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,440 $0 Implemented
UD0150 # 02 Y:1985 02 1985 INSTALL STORM WINDOWS AND DOORS $7,089 $4,000 Not Implemented
UD0150 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,196 $2,972 Not Implemented
UD0150 # 04 Y:1985 04 1985 INSTALL TIMERS AND/OR THERMOSTATS $646 $140 Implemented
UD0150 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $702 $3,000 Implemented