IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0327 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,029 $1,500 Not Implemented
ND0327 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $744 $1,392 Implemented
ND0327 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $564 $420 Not Implemented
ND0327 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140 $315 Not Implemented
ND0327 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $105 $120 Not Implemented
ND0327 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $510 $1,150 Not Implemented
ND0327 # 09 Y:1999 09 1999 MODIFY STARTUP/SHUTDOWN TIMES $16,882 $0 Implemented
ND0327 # 10 Y:1999 10 1999 PAY BILLS ON TIME TO AVOID LATE FEES $1,106 $0 Implemented
ND0327 # 11 Y:1999 11 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $429 $0 Not Implemented
MS0140 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,728 $790 Implemented
MS0140 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $7,639 $7,425 Not Implemented
MS0140 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,814 $1,440 Not Implemented
MS0140 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,213 $2,922 Implemented
MS0140 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $666 $389 Implemented
MS0140 # 06 Y:1999 06 1999 INSTALL TIMERS AND/OR THERMOSTATS $11,408 $1,299 Implemented
MS0140 # 07 Y:1999 07 1999 BURN WASTE OIL FOR HEAT $5,179 $4,416 Not Implemented
MS0140 # 08 Y:1999 08 1999 IMPROVE SPACE COMFORT CONDITIONING $45,000 $19,688 Implemented
OD0142 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,924 $25,775 Not Implemented
OD0142 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $159 $20 Not Implemented
OD0142 # 03 Y:1999 03 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,104 $130 Not Implemented
OD0142 # 04 Y:1999 04 1999 PAY BILLS ON TIME TO AVOID LATE FEES $1,270 $0 Not Implemented
WV0175 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $177 $200 Not Implemented
WV0175 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $332 $204 Not Implemented
WV0175 # 03 Y:1999 03 1999 REPAIR OR REPLACE STEAM TRAPS $426,829 $88,360 Implemented
WV0175 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $14,700 $14,700 Implemented