Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0490 # 03 Y:2020 | 03 | 2020 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $5,008 | $12,000 | Not Implemented |
LE0490 # 04 Y:2020 | 04 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,370 | $4,000 | Implemented |
LE0490 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,681 | $5,750 | Implemented |
LE0490 # 06 Y:2020 | 06 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,572 | $60,000 | Implemented |
LE0490 # 07 Y:2020 | 07 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $9,005 | $35,000 | Not Implemented |
MI0369 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,259 | $580 | Implemented |
MI0369 # 02 Y:2020 | 02 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $6,954 | $7,492 | Implemented |
MI0369 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,267 | $1,980 | Implemented |
MI0369 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,265 | $7,389 | Not Implemented |
MI0369 # 05 Y:2020 | 05 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $551 | $280 | Not Implemented |
MI0369 # 06 Y:2020 | 06 | 2020 | PAY BILLS ON TIME TO AVOID LATE FEES | $438 | $0 | Not Implemented |
IP0132 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $879 | $0 | Not Implemented |
IP0132 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,251 | $64 | Implemented |
IP0132 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $711 | $47 | Implemented |
IP0132 # 04 Y:2020 | 04 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,488 | $3,597 | Not Implemented |
WM0154 # 01 Y:2020 | 01 | 2020 | REPLACE BOILER | $58,212 | $300,000 | Not Implemented |
WM0154 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,376 | $54,000 | Implemented |
WM0154 # 03 Y:2020 | 03 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,697 | $2,500 | Not Implemented |
WM0154 # 04 Y:2020 | 04 | 2020 | PAY UTILITY BILLS ON TIME | $1,563 | $0 | Implemented |
WM0154 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,436 | $3,500 | Implemented |
WM0154 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,228 | $1,500 | Implemented |
WM0154 # 07 Y:2020 | 07 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $599 | $1,500 | Implemented |
UU0162 # 01 Y:2020 | 01 | 2020 | REDUCE FLUID FLOW RATES | $8,259 | $17,871 | Implemented |
UU0162 # 02 Y:2020 | 02 | 2020 | UPGRADE OBSOLETE EQUIPMENT | $5,390 | $7,024 | Not Implemented |
UU0162 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,096 | $5,759 | Implemented |