IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,738

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0021 # 05 Y:1994 05 1994 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $3,017 $5,760 Implemented
AR0021 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $794 $300 Implemented
AR0021 # 07 Y:1994 07 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,740 $790 Implemented
AR0021 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,386 $822 Implemented
AR0021 # 09 Y:1994 09 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $1,947 $0 Implemented
AR0020 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,988 $250 Implemented
AR0020 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,843 $1,300 Implemented
AR0020 # 03 Y:1994 03 1994 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $3,547 $5,250 Implemented
AR0020 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,351 $2,100 Implemented
AR0020 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,102 $712 Implemented
AR0020 # 06 Y:1994 06 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,983 $670 Implemented
AR0019 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,832 $450 Implemented
AR0019 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,270 $1,996 Implemented
AR0019 # 03 Y:1994 03 1994 REPAIR AND ELIMINATE STEAM LEAKS $8,858 $2,200 Implemented
AR0019 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,987 $1,177 Implemented
AR0019 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,704 $0 Not Implemented
AR0019 # 06 Y:1994 06 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $22,243 $47,000 Not Implemented
AR0018 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,756 $800 Implemented
AR0018 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,336 $1,140 Implemented
AR0018 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,883 $533 Implemented
AR0018 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,234 $350 Implemented
AR0018 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,532 $5,850 Implemented
AR0018 # 06 Y:1994 06 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $38,242 $143,000 Not Implemented
AR0018 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $500 $250 Not Implemented
AR0018 # 08 Y:1994 08 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,672 $400 Not Implemented