IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0305 # 02 Y:1990 02 1990 REDESIGN PROCESS $27,002 $15,000 Not Implemented
KU0305 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $13,188 $20,000 Not Implemented
KU0305 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,169 $13,750 Not Implemented
KU0305 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,945 $0 Implemented
KU0305 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $416 $750 Implemented
KU0301 # 01 Y:1990 01 1990 INSTALL SET-BACK TIMERS $3,805 $140 Implemented
KU0301 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $467 $6,120 Implemented
KU0301 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,576 $2,878 Implemented
KU0301 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $15,127 $17,246 Implemented
KU0301 # 05 Y:1990 05 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,417 $0 Implemented
KU0301 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $380 $0 Implemented
KU0301 # 07 Y:1990 07 1990 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,923 $4,500 Not Implemented
KU0302 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $980 $0 Implemented
KU0302 # 02 Y:1990 02 1990 SHUT OFF PILOTS IN STANDBY EQUIPMENT $254 $0 Implemented
KU0302 # 03 Y:1990 03 1990 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $637 $500 Not Implemented
KU0302 # 04 Y:1990 04 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $265 $100 Not Implemented
KU0302 # 05 Y:1990 05 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $235 $180 Implemented
KU0302 # 06 Y:1990 06 1990 DISCONNECT BALLASTS $123 $100 Implemented
KU0302 # 07 Y:1990 07 1990 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,210 $0 Implemented
KU0300 # 01 Y:1989 01 1989 INSTALL SET-BACK TIMERS $9,699 $500 Implemented
KU0300 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,850 $1,780 Implemented
KU0300 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,500 $0 Not Implemented
KU0300 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,353 $5,000 Implemented
KU0300 # 05 Y:1989 05 1989 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,393 $2,000 Implemented
OK0299 # 01 Y:1989 01 1989 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $7,885 $23,283 Implemented