IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0146 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,378 $20 n/a
UL0146 # 04 Y:1996 04 1996 RECOVER AND REUSE WASTE MATERIAL $12,300 $12,500 n/a
UL0146 # 05 Y:1996 05 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $450 $0 n/a
UL0146 # 06 Y:1996 06 1996 USE A RAG RECYCLE SERVICE $2,360 $50 n/a
UL0145 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $1,151 Not Implemented
UL0145 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,159 $8,988 Not Implemented
UL0145 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $30,246 $21,220 Not Implemented
UL0145 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,624 $60 Not Implemented
UL0145 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,450 $60 Not Implemented
UL0144 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,436 $2,000 n/a
UL0144 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $375 $854 n/a
UL0144 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $444 $170 n/a
UL0144 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $993 $40 n/a
UL0144 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $366 $20 n/a
UD0479 # 01 Y:1995 01 1995 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,667 $0 Implemented
UD0479 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,043 $16,000 Implemented
UD0479 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,152 $17,500 Implemented
UD0479 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,184 $14,654 Implemented
UL0143 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,882 $5,564 n/a
UL0143 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $957 $1,539 n/a
UL0143 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $20,656 $19,584 n/a
UL0143 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,980 $40 n/a
UL0143 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,522 $20 n/a
UL0142 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $482 $40 n/a
UL0142 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $177 $54 n/a