IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0676 # 05 Y:2015 05 2015 REPAIR AND ELIMINATE STEAM LEAKS $7,850 $4,000 Implemented
AM0676 # 06 Y:2015 06 2015 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,100 $0 Not Implemented
AM0676 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,420 $7,200 Not Implemented
AM0676 # 08 Y:2015 08 2015 INSULATE BARE EQUIPMENT $1,140 $480 Not Implemented
AM0676 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $785 $0 Not Implemented
AM0676 # 10 Y:2015 10 2015 USE SYNTHETIC LUBRICANT $594 $0 Not Implemented
AM0675 # 01 Y:2015 01 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $31,650 $2,210 Not Implemented
AM0675 # 02 Y:2015 02 2015 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,020 $60 Implemented
AM0675 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,670 $610 Not Implemented
AM0675 # 04 Y:2015 04 2015 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,990 $0 Implemented
AM0675 # 05 Y:2015 05 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,250 $0 Implemented
AM0675 # 06 Y:2015 06 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,950 $2,000 Implemented
AM0675 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $250 $130 Not Implemented
AM0674 # 01 Y:2015 01 2015 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $23,350 $24,500 Not Implemented
AM0674 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $4,070 $3,950 Not Implemented
AM0674 # 03 Y:2015 03 2015 REPAIR OR REPLACE STEAM TRAPS $2,350 $440 Implemented
AM0674 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,420 $5 Not Implemented
AM0674 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,185 $500 Implemented
AM0674 # 06 Y:2015 06 2015 INSULATE FEEDWATER TANK $950 $140 Not Implemented
AM0674 # 07 Y:2015 07 2015 INSTALL SKYLIGHTS $625 $970 Not Implemented
AM0674 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $550 $275 Implemented
AM0674 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $430 $0 Not Implemented
AM0673 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,785 $15,000 Implemented
AM0673 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,669 $18 Implemented
AM0673 # 03 Y:2015 03 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $26,256 $6,650 Not Implemented