IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0424 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,204 $1,000 Implemented
UM0424 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,141 $600 Not Implemented
UM0424 # 04 Y:2013 04 2013 USE MORE EFFICIENT ADHESIVE APPLICATORS $44,144 $40,000 Not Implemented
UM0424 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,695 $1,600 Implemented
OR0606 # 01 Y:2013 01 2013 UPGRADE CONTROLS ON COMPRESSORS $161,379 $344 Not Implemented
OR0606 # 02 Y:2013 02 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $39,128 $0 Not Implemented
OR0606 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $119,795 $0 Not Implemented
OR0606 # 04 Y:2013 04 2013 CHANGE OPERATING CONDITIONS $14,380 $0 Not Implemented
OR0606 # 05 Y:2013 05 2013 REDUCE FLUID FLOW RATES $9,051 $9,200 Not Implemented
OR0606 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $20,282 $25,500 Not Implemented
OR0607 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $52,535 $27,268 Not Implemented
OR0607 # 02 Y:2013 02 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,626 $5,352 Not Implemented
OR0607 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $3,603 $9,150 Not Implemented
OR0607 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,983 $7,504 Implemented
OR0607 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,021 $5,130 Implemented
OR0605 # 01 Y:2013 01 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $14,401 $11,850 Not Implemented
OR0605 # 02 Y:2013 02 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $29,593 $32,655 Implemented
OR0605 # 03 Y:2013 03 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $23,767 $234,289 Not Implemented
MZ0112 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,576 $14,260 Implemented
MZ0112 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $6,417 $3,000 Implemented
MZ0112 # 03 Y:2013 03 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $4,329 $0 Not Implemented
MZ0112 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,415 $0 Implemented
MZ0112 # 05 Y:2013 05 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $48,000 $2,270 Implemented
MZ0112 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,024 $1,150 Not Implemented
MZ0112 # 07 Y:2013 07 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,737 $0 Not Implemented