IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1622 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,014 $1,496 Not Implemented
LS1622 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $250 $200 Not Implemented
LS1622 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,928 $6,120 Implemented
WV0623 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $72,629 $104,885 Implemented
WV0623 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $61,441 $127,733 Implemented
WV0623 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $51,704 $257,600 Implemented
WV0623 # 04 Y:2022 04 2022 RECYCLE WHITE WATER $19,492 $11,082 Not Implemented
WV0623 # 05 Y:2022 05 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $19,461 $91,800 Not Implemented
WV0623 # 06 Y:2022 06 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,348 $3,600 Not Implemented
WV0623 # 07 Y:2022 07 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $12,693 $51,500 Not Implemented
WV0623 # 08 Y:2022 08 2022 REDUCE VENTILATION AIR $8,396 $19,558 Not Implemented
WV0623 # 09 Y:2022 09 2022 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,154 $13,600 Not Implemented
WV0623 # 10 Y:2022 10 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,877 $2,813 Implemented
WV0623 # 11 Y:2022 11 2022 UPGRADE CONTROLS ON COMPRESSORS $1,756 $299 Implemented
WV0623 # 12 Y:2022 12 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,660 $3,000 Implemented
WV0623 # 13 Y:2022 13 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,487 $990 Implemented
WV0623 # 14 Y:2022 14 2022 DEVELOP A REPAIR/REPLACE POLICY $1,356 $2,300 Implemented
WV0623 # 15 Y:2022 15 2022 UPGRADE CONTROLS ON COMPRESSORS $1,341 $4,835 Implemented
WV0623 # 16 Y:2022 16 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $313 $1,500 Not Implemented
LS1522 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $59,902 $3,750 Implemented
LS1522 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,079 $33,425 Implemented
LS1522 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $3,599 $4,375 Not Implemented
LS1522 # 04 Y:2022 04 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $702 $1,050 Not Implemented
LS1522 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $872 $4,215 Not Implemented
WM0179 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,169 $43,950 Not Implemented