IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0302 # 03 Y:2010 03 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $19,885 $35,220 Not Implemented
LE0302 # 04 Y:2010 04 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,289 $6,000 Not Implemented
LE0302 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,786 $1,720 Implemented
LE0302 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $46,342 $10,000 Implemented
LE0302 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $18,237 $12,000 Not Implemented
LE0302 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,646 $480 Implemented
LE0302 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,383 $15,780 Not Implemented
LE0302 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $1,414 $300 Not Implemented
WV0412 # 01 Y:2010 01 2010 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $40,280 $8,312 Not Implemented
WV0412 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,302 $45,934 Implemented
WV0412 # 03 Y:2010 03 2010 USE RADIANT HEATER FOR SPOT HEATING $8,774 $26,060 Not Implemented
WV0412 # 04 Y:2010 04 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,191 $9,460 Not Implemented
WV0412 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,536 $5,263 Implemented
WV0412 # 06 Y:2010 06 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,764 $1,000 Implemented
WV0412 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,926 $686 Not Implemented
WV0412 # 08 Y:2010 08 2010 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,795 $0 Implemented
WV0412 # 09 Y:2010 09 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $480 $284 Not Implemented
LE0301 # 01 Y:2010 01 2010 REPLACE BOILER $284,580 $500,000 Not Implemented
LE0301 # 02 Y:2010 02 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $185,253 $118,000 Not Implemented
LE0301 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,617 $13,469 Implemented
LE0301 # 04 Y:2010 04 2010 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $28,496 $10,000 Not Implemented
LE0301 # 05 Y:2010 05 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $24,299 $75,000 Not Implemented
LE0301 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $23,321 $4,200 Implemented
LE0301 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,721 $22,000 Not Implemented
LE0301 # 08 Y:2010 08 2010 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,375 $100,000 Not Implemented