Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0202 # 02 Y:1998 | 02 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $731 | $200 | Not Implemented |
UL0202 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $971 | $131 | Not Implemented |
UL0202 # 04 Y:1998 | 04 | 1998 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $98,600 | $380,000 | Not Implemented |
UL0202 # 05 Y:1998 | 05 | 1998 | USE PLASTIC PALLETS INSTEAD OF WOOD | $45,400 | $65,000 | Not Implemented |
UL0202 # 06 Y:1998 | 06 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $39,940 | $70,000 | Not Implemented |
TN0640 # 01 Y:1998 | 01 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $135,200 | $72,120 | Implemented |
TN0640 # 02 Y:1998 | 02 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $24,975 | $27,000 | Implemented |
TN0640 # 03 Y:1998 | 03 | 1998 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $7,440 | $400 | Implemented |
TN0640 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,140 | $2,765 | Implemented |
TN0640 # 05 Y:1998 | 05 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,110 | $830 | Not Implemented |
TN0640 # 06 Y:1998 | 06 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $85 | $50 | Implemented |
NV0107 # 01 Y:1998 | 01 | 1998 | REPAIR AND ELIMINATE STEAM LEAKS | $151 | $100 | n/a |
NV0107 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $108 | $180 | n/a |
NV0107 # 03 Y:1998 | 03 | 1998 | INSULATE BARE EQUIPMENT | $311 | $937 | n/a |
NV0107 # 04 Y:1998 | 04 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $769 | $951 | n/a |
NV0107 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,050 | $100 | n/a |
NV0107 # 06 Y:1998 | 06 | 1998 | INSTALL OCCUPANCY SENSORS | $562 | $355 | n/a |
NV0107 # 07 Y:1998 | 07 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $69,226 | $92,537 | n/a |
HO0186 # 01 Y:1998 | 01 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $268 | $0 | Implemented |
HO0186 # 02 Y:1998 | 02 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,988 | $0 | Implemented |
HO0186 # 03 Y:1998 | 03 | 1998 | USE RADIANT HEATER FOR SPOT HEATING | $6,903 | $6,000 | Not Implemented |
HO0186 # 04 Y:1998 | 04 | 1998 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,873 | $3,000 | Implemented |
HO0186 # 05 Y:1998 | 05 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $11,162 | $5,000 | Implemented |
HO0186 # 06 Y:1998 | 06 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $3,900 | $1,000 | Implemented |
OD0114 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,198 | $1,457 | Implemented |