IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0202 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $731 $200 Not Implemented
UL0202 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $971 $131 Not Implemented
UL0202 # 04 Y:1998 04 1998 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $98,600 $380,000 Not Implemented
UL0202 # 05 Y:1998 05 1998 USE PLASTIC PALLETS INSTEAD OF WOOD $45,400 $65,000 Not Implemented
UL0202 # 06 Y:1998 06 1998 $39,940 $70,000 Not Implemented
TN0640 # 01 Y:1998 01 1998 $135,200 $72,120 Implemented
TN0640 # 02 Y:1998 02 1998 $24,975 $27,000 Implemented
TN0640 # 03 Y:1998 03 1998 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $7,440 $400 Implemented
TN0640 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,140 $2,765 Implemented
TN0640 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,110 $830 Not Implemented
TN0640 # 06 Y:1998 06 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $85 $50 Implemented
NV0107 # 01 Y:1998 01 1998 REPAIR AND ELIMINATE STEAM LEAKS $151 $100 n/a
NV0107 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $108 $180 n/a
NV0107 # 03 Y:1998 03 1998 INSULATE BARE EQUIPMENT $311 $937 n/a
NV0107 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $769 $951 n/a
NV0107 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,050 $100 n/a
NV0107 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $562 $355 n/a
NV0107 # 07 Y:1998 07 1998 RECOVER WASTE HEAT FROM EQUIPMENT $69,226 $92,537 n/a
HO0186 # 01 Y:1998 01 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $268 $0 Implemented
HO0186 # 02 Y:1998 02 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,988 $0 Implemented
HO0186 # 03 Y:1998 03 1998 USE RADIANT HEATER FOR SPOT HEATING $6,903 $6,000 Not Implemented
HO0186 # 04 Y:1998 04 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,873 $3,000 Implemented
HO0186 # 05 Y:1998 05 1998 INSTALL TIMERS AND/OR THERMOSTATS $11,162 $5,000 Implemented
HO0186 # 06 Y:1998 06 1998 $3,900 $1,000 Implemented
OD0114 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,198 $1,457 Implemented