IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0576 # 02 Y:2010 02 2010 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,950 $6,850 Not Implemented
AM0576 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,800 $20,100 Implemented
AM0576 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $300 Implemented
AM0576 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $1,263 $79 Implemented
AM0576 # 06 Y:2010 06 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,040 $760 Implemented
AM0576 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $757 $16 Not Implemented
AM0576 # 08 Y:2010 08 2010 INSTALL SKYLIGHTS $740 $1,600 Not Implemented
AM0576 # 09 Y:2010 09 2010 INSTALL SKYLIGHTS $450 $970 Not Implemented
AM0576 # 10 Y:2010 10 2010 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $280 $300 Not Implemented
UW0036 # 01 Y:2010 01 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $30,860 $61,720 Not Implemented
UW0036 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,120 $1,590 Not Implemented
UW0036 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $1,039 $1,072 Not Implemented
UW0036 # 04 Y:2010 04 2010 PAY BILLS ON TIME TO AVOID LATE FEES $819 $45 Not Implemented
UW0036 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $417 $825 Not Implemented
OK0789 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $80,818 $182,391 Not Implemented
OK0789 # 02 Y:2010 02 2010 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $20,004 $15,450 Not Implemented
OK0789 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,970 $31,888 Implemented
OK0789 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,476 $144,256 Not Implemented
OK0789 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $384 $1,579 Not Implemented
OK0789 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,798 $7,980 Implemented
OK0789 # 07 Y:2010 07 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,330 $17,280 Not Implemented
OK0789 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $827 $896 Implemented
OK0789 # 09 Y:2010 09 2010 INSULATE BARE EQUIPMENT $10,734 $5,136 Not Implemented
OK0789 # 10 Y:2010 10 2010 USE POWER DURING OFF-PEAK PERIODS $34,743 $99,978 Not Implemented
OK0789 # 11 Y:2010 11 2010 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $997 $1,486 Implemented