IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0084 # 10 Y:2017 10 2017 APPLY FOR INVESTMENT INCENTIVES $238 $125 Not Implemented
IP0084 # 11 Y:2017 11 2017 INSTALL OCCUPANCY SENSORS $3,393 $2,038 Implemented
IP0084 # 12 Y:2017 12 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $519 $727 Not Implemented
IP0084 # 13 Y:2017 13 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $446 $1,250 Implemented
IP0084 # 14 Y:2017 14 2017 OPTIMIZE PLANT POWER FACTOR $13,460 $43,320 Not Implemented
UU0117 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,965 $96,413 Implemented
UU0117 # 02 Y:2017 02 2017 INSTALL SPECTRAL REFLECTORS / DELAMP $34,105 $2,426 Not Implemented
UU0117 # 03 Y:2017 03 2017 REDESIGN PROCESS $25,877 $35,010 Not Implemented
UU0117 # 04 Y:2017 04 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,087 $100 Not Implemented
UU0117 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,843 $1,647 Implemented
UU0117 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,522 $0 Not Implemented
UU0117 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $779 $1,695 Not Implemented
TT0190 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,543 $127,654 Not Implemented
TT0190 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $29,422 $57,000 Not Implemented
TT0190 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,110 $15,000 Not Implemented
TT0190 # 04 Y:2017 04 2017 OPTIMIZE PLANT POWER FACTOR $3,337 $8,000 Not Implemented
TT0190 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $280 $1,000 Not Implemented
TT0190 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $88 $200 Implemented
DL0175 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,617 $180,488 Not Implemented
DL0175 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,500 $144,400 Not Implemented
DL0175 # 03 Y:2017 03 2017 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $84,055 $4,400 Not Implemented
DL0175 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $62,553 $233,080 Not Implemented
AS0438 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,271 $100 Implemented
AS0438 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,534 $60 Not Implemented
AS0438 # 03 Y:2017 03 2017 USE SYNTHETIC LUBRICANT $490 $609 Not Implemented