IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0813 # 02 Y:2020 02 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,202 $27,887 Not Implemented
MA0813 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,915 $1,000 Not Implemented
MA0813 # 04 Y:2020 04 2020 OPTIMIZE PLANT POWER FACTOR $4,535 $8,890 Not Implemented
MA0813 # 05 Y:2020 05 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,060 $9,957 Not Implemented
OK1024 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,729 $0 Not Implemented
OK1024 # 02 Y:2020 02 2020 RECOVER WASTE HEAT FROM EQUIPMENT $6,084 $2,187 Not Implemented
OK1024 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,608 $4,500 Not Implemented
OK1024 # 04 Y:2020 04 2020 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $515 $540 Not Implemented
OK1024 # 05 Y:2020 05 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,437 $3,178 Not Implemented
OK1024 # 06 Y:2020 06 2020 INSTALL TIMERS AND/OR THERMOSTATS $34,324 $2,448 Not Implemented
TT0233 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,084 $30,000 Implemented
TT0233 # 02 Y:2020 02 2020 METER WASTE WATER $52,049 $2,000 Implemented
TT0233 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $43,091 $147,540 Implemented
TT0233 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,859 $20 Implemented
TT0233 # 05 Y:2020 05 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,206 $22,392 Not Implemented
TT0233 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,658 $2,000 Implemented
TT0233 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $565 $1,450 Not Implemented
TR0022 # 01 Y:2020 01 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,078 $0 Not Implemented
TR0022 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,125 $1,000 Implemented
TR0022 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,666 $10,056 Implemented
TR0022 # 04 Y:2020 04 2020 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $204 $102 Implemented
TR0022 # 05 Y:2020 05 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,951 $15,000 Not Implemented
TR0022 # 06 Y:2020 06 2020 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,628 $0 Implemented
MA0814 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $89,868 $533,354 Not Implemented
MA0814 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,091 $65,600 Not Implemented