IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0266 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,833 $1,189 Implemented
NC0266 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $61 $132 Implemented
NC0266 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $744 $1,456 Implemented
GT0748 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $116,954 $2,000 n/a
GT0748 # 02 Y:2003 02 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $44,604 $85,000 n/a
GT0748 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $28,809 $0 n/a
GT0748 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,314 $2,844 n/a
GT0748 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,272 $17,760 n/a
GT0748 # 06 Y:2003 06 2003 USE OPTIMUM TEMPERATURE $76,382 $16,640 n/a
GT0748 # 07 Y:2003 07 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $22,400 $22,800 n/a
GT0748 # 08 Y:2003 08 2003 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $810,975 $4,250,000 n/a
NC0264 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $126 $357 Not Implemented
NC0264 # 02 Y:2003 02 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $743 $3,100 Not Implemented
NC0264 # 03 Y:2003 03 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,182 $3,115 Not Implemented
NC0264 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $454 $630 Implemented
NC0264 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $463 $800 Not Implemented
NC0264 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $152 $627 Implemented
NC0264 # 07 Y:2003 07 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,875 $500 Not Implemented
NC0264 # 08 Y:2003 08 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $160 $280 Not Implemented
NC0264 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $264 $100 Not Implemented
NC0264 # 10 Y:2003 10 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,393 $350 Implemented
NC0263 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $118,487 $500 Not Implemented
NC0263 # 02 Y:2003 02 2003 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $22,423 $10,000 Not Implemented
NC0263 # 03 Y:2003 03 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $33,114 $24,600 Not Implemented
NC0263 # 04 Y:2003 04 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $47,210 $100,000 Implemented