Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0938 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $4,491 | $2,935 | Not Implemented |
OK0938 # 08 Y:2016 | 08 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,294 | $5,000 | Not Implemented |
OK0938 # 09 Y:2016 | 09 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,693 | $3,236 | Implemented |
OK0938 # 10 Y:2016 | 10 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $372,611 | $70,000 | Not Implemented |
OK0938 # 11 Y:2016 | 11 | 2016 | OPTIMIZE PLANT POWER FACTOR | $26,300 | $47,542 | Implemented |
OK0938 # 12 Y:2016 | 12 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $308,836 | $1,371,615 | Not Implemented |
SU0411 # 01 Y:2016 | 01 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,414 | $0 | Implemented |
SU0411 # 02 Y:2016 | 02 | 2016 | REDUCE VENTILATION AIR | $3,422 | $10,350 | Implemented |
SU0411 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,158 | $1,449 | Implemented |
SU0411 # 04 Y:2016 | 04 | 2016 | ELIMINATE/REDUCE AN OPERATION | $3,627 | $6,660 | Implemented |
SU0411 # 05 Y:2016 | 05 | 2016 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $167 | $235 | Implemented |
SU0411 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,579 | $45,826 | Not Implemented |
IP0064 # 01 Y:2016 | 01 | 2016 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $839 | $0 | Implemented |
IP0064 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $398 | $5 | Implemented |
IP0064 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,306 | $250 | Implemented |
IP0064 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,082 | $700 | Implemented |
IP0064 # 05 Y:2016 | 05 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $538 | $878 | Implemented |
IP0064 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $382 | $888 | Implemented |
IP0064 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $893 | $3,007 | Implemented |
BD0481 # 01 Y:2016 | 01 | 2016 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $8,603 | $10,500 | Not Implemented |
BD0481 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,932 | $50 | Not Implemented |
BD0481 # 03 Y:2016 | 03 | 2016 | USE POWER DURING OFF-PEAK PERIODS | $915 | $100 | Not Implemented |
BD0481 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $902 | $3,944 | Implemented |
BD0481 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $764 | $600 | Implemented |
BD0481 # 06 Y:2016 | 06 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $760 | $1,040 | Not Implemented |