Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0115 # 02 Y:2006 | 02 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,985 | $16,831 | Implemented |
IC0115 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,680 | $65,036 | Implemented |
IC0115 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $272 | $420 | Implemented |
IC0115 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $159 | $380 | Not Implemented |
IC0115 # 06 Y:2006 | 06 | 2006 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $54 | $284 | Implemented |
IC0115 # 07 Y:2006 | 07 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $142,200 | $195,625 | Not Implemented |
IC0115 # 08 Y:2006 | 08 | 2006 | REPLACE BOILER | $125,042 | $193,200 | Implemented |
IC0115 # 09 Y:2006 | 09 | 2006 | REDUCE EXCESS STEAM BLEEDING | $29,262 | $5,000 | Implemented |
GT0822 # 01 Y:2006 | 01 | 2006 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $22,995 | $640 | Implemented |
GT0822 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,292 | $10,800 | Not Implemented |
GT0822 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $97,628 | $18,865 | Implemented |
GT0822 # 04 Y:2006 | 04 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,620 | $850 | Not Implemented |
GT0822 # 05 Y:2006 | 05 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $60,069 | $87,937 | Not Implemented |
GT0822 # 06 Y:2006 | 06 | 2006 | COMBINE UTILITY METERS | $4,697 | $0 | Not Implemented |
GT0822 # 07 Y:2006 | 07 | 2006 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $450,000 | $20,000 | Implemented |
LL0251 # 01 Y:2006 | 01 | 2006 | CONVERT TO OXYFUEL BURNERS | $457,261 | $150,000 | Not Implemented |
LL0251 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,258 | $11,040 | Not Implemented |
LL0251 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $19,891 | $2,392 | Implemented |
LL0251 # 04 Y:2006 | 04 | 2006 | USE PHOTOCELL CONTROLS | $4,548 | $450 | Not Implemented |
LL0251 # 05 Y:2006 | 05 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,060 | $3,280 | Not Implemented |
LL0251 # 06 Y:2006 | 06 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,767 | $3,600 | Not Implemented |
LL0251 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $6,369 | $9,300 | Implemented |
LL0251 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $634 | $787 | Implemented |
LL0251 # 09 Y:2006 | 09 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $508 | $960 | Not Implemented |
LL0251 # 10 Y:2006 | 10 | 2006 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $302 | $930 | Not Implemented |