Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0642 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,645 | $2,652 | Implemented |
AM0642 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,332 | $636 | Implemented |
AM0642 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,230 | $500 | Implemented |
AM0642 # 07 Y:2013 | 07 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,220 | $400 | Implemented |
AM0642 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $954 | $2,680 | Implemented |
AM0642 # 09 Y:2013 | 09 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $750 | $9 | Implemented |
AM0642 # 10 Y:2013 | 10 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $171 | $0 | Implemented |
LE0357 # 01 Y:2013 | 01 | 2013 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $990,391 | $2,480,000 | Not Implemented |
LE0357 # 02 Y:2013 | 02 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $41,310 | $87,100 | Implemented |
LE0357 # 03 Y:2013 | 03 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $992 | $225 | Implemented |
LE0357 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $143,805 | $5,420 | Not Implemented |
LE0357 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,839 | $0 | Implemented |
LE0357 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,062 | $3,910 | Implemented |
LE0357 # 07 Y:2013 | 07 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,733 | $11,400 | Not Implemented |
LE0357 # 08 Y:2013 | 08 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $1,285 | $4,500 | Implemented |
LE0357 # 09 Y:2013 | 09 | 2013 | OPTIMIZE PLANT POWER FACTOR | $20,522 | $42,000 | Implemented |
LE0357 # 10 Y:2013 | 10 | 2013 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $38 | $110 | Implemented |
TT0113 # 01 Y:2013 | 01 | 2013 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $12,194 | $0 | Not Implemented |
TT0113 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $29,010 | $0 | Not Implemented |
TT0113 # 03 Y:2013 | 03 | 2013 | DISCONNECT BALLASTS | $1,433 | $0 | Not Implemented |
TT0113 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $135 | $114 | Not Implemented |
TT0113 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $14,759 | $20,200 | Not Implemented |
TT0113 # 06 Y:2013 | 06 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $21,613 | $30,289 | Not Implemented |
TT0113 # 07 Y:2013 | 07 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $2,195 | $5,600 | Not Implemented |
SU0345 # 01 Y:2013 | 01 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $97 | $0 | Not Implemented |