IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0190 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,642 $1,165 Implemented
UA0190 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,214 $250 Not Implemented
UA0190 # 07 Y:2018 07 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,316 $2,353 Not Implemented
UA0190 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $150 $258 Implemented
UA0190 # 09 Y:2018 09 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,007 $1,612 Not Implemented
LE0449 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,357 $1,000 Implemented
LE0449 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,677 $2,850 Not Implemented
LE0449 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,339 $3,500 Not Implemented
LE0449 # 04 Y:2018 04 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $298,212 $362,400 Not Implemented
LE0449 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,930 $20,000 Not Implemented
LE0449 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,078 $3,780 Implemented
LE0449 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $913 $2,750 Not Implemented
LE0449 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $945 $4,252 Implemented
LE0449 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,515 $6,962 Implemented
SD0560 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,197 $59,204 Not Implemented
SD0560 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,240 $11,880 Implemented
SD0560 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,961 $19,600 Implemented
SD0560 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,948 $1,200 Implemented
SD0560 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,307 $600 Not Implemented
LS1802 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $379 $0 Implemented
LS1802 # 02 Y:2018 02 2018 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $1,300 $200 Implemented
LS1802 # 03 Y:2018 03 2018 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $4,166 $2,667 Not Implemented
LS1802 # 04 Y:2018 04 2018 USE PHOTOCELL CONTROLS $427 $400 Implemented
LS1802 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $159 $550 Implemented
AM0745 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $45,900 $0 Not Implemented