Search recommendations based on selected criteria.
RESET

142,349

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
TN0155 # 01 Y:1982 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $29,118 $6,200
TN0157 # 03 Y:1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $140 $64
TN0157 # 02 Y:1982 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $576 $1,400
TN0157 # 01 Y:1982 INSULATE BARE EQUIPMENT $3,340 $6,000
UD0054 # 04 Y:1982 INSTALL STORM WINDOWS AND DOORS $20,425 $29,798
UD0054 # 03 Y:1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,264 $8,000
UD0054 # 02 Y:1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $15,588 $146,250
UD0054 # 01 Y:1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,558 $872
UD0055 # 01 Y:1982 INSULATE BARE EQUIPMENT $2,363 $1,260
UD0056 # 03 Y:1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,145 $517,000
UD0056 # 02 Y:1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $232,119 $517,000
UD0056 # 01 Y:1982 INSTALL STORM WINDOWS AND DOORS $773 $600
UD0057 # 03 Y:1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $153 $0
UD0057 # 01 Y:1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $422 $140
UD0057 # 02 Y:1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,865 $5,000
Back to Top