IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0280 # 01 Y:1989 01 1989 INSULATE BARE EQUIPMENT $3,621 $500 Not Implemented
KU0280 # 02 Y:1989 02 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,382 $0 Implemented
KU0280 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $2,032 Not Implemented
KU0280 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $440 $100 Implemented
KU0280 # 05 Y:1989 05 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $250 $0 Implemented
KU0280 # 06 Y:1989 06 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $293 $560 Not Implemented
KU0280 # 07 Y:1989 07 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $143 $40 Implemented
KU0267 # 01 Y:1988 01 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $807 $207 Implemented
KU0267 # 02 Y:1988 02 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $968 $475 Implemented
KU0267 # 03 Y:1988 03 1988 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,215 $10,000 Not Implemented
KU0267 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,811 $30 Implemented
KU0267 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,716 $5,201 Implemented
KU0267 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,058 $2,400 Not Implemented
KU0270 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,368 $16,108 Not Implemented
KU0270 # 02 Y:1988 02 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,463 $1,660 Not Implemented
KU0270 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,463 $775 Implemented
KU0270 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,151 $1,000 Implemented
KU0270 # 05 Y:1988 05 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $755 $940 Implemented
KU0270 # 06 Y:1988 06 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,192 $0 Not Implemented
KU0270 # 07 Y:1988 07 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,329 $7,575 Implemented
KU0270 # 08 Y:1988 08 1988 INSTALL TIMERS AND/OR THERMOSTATS $4,749 $15 Not Implemented
KU0270 # 09 Y:1988 09 1988 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,221 $0 Not Implemented
KU0270 # 10 Y:1988 10 1988 TREAT AND REUSE RINSE WATERS $2,921 $4,700 Not Implemented
KU0254 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,185 $2,000 Implemented
KU0254 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $191 $0 Not Implemented