IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0527 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,268 $21,268 Implemented
UF0527 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,537 $24,798 Implemented
UF0527 # 03 Y:2019 03 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,597 $6,350 Not Implemented
UF0527 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,462 $7,500 Not Implemented
UF0527 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $456 Implemented
UF0527 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $1,039 $1,393 Implemented
UF0527 # 07 Y:2019 07 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $24,935 $1,665 Implemented
TT0220 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,872 $88,116 Implemented
TT0220 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $34,064 $64,000 Not Implemented
TT0220 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,304 $80 Implemented
TT0220 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,995 $6,300 Implemented
TT0220 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,534 $60 Implemented
TT0220 # 06 Y:2019 06 2019 RECOVER WASTE HEAT FROM EQUIPMENT $5,115 $15,000 Not Implemented
TT0220 # 07 Y:2019 07 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,624 $2,150 Not Implemented
TT0220 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,527 $945 Not Implemented
TT0220 # 09 Y:2019 09 2019 CHECK FOR ACCURACY OF UTILITY / POWER METERS $340 $60 Implemented
LS1907 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $302 $50 Not Implemented
LS1907 # 02 Y:2019 02 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,921 $500 Not Implemented
LS1907 # 03 Y:2019 03 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $180 $75 Not Implemented
LS1907 # 04 Y:2019 04 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $305 $180 Not Implemented
LS1907 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $40 $25 Not Implemented
LS1907 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,396 $6,225 Not Implemented
LS1907 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $179 $135 Not Implemented
LS1907 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,362 $10,917 Not Implemented
LS1907 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $70 $205 Not Implemented