IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1805 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $409 $570 n/a
UK1805 # 06 Y:2018 06 2018 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $495 $1,250 n/a
UK1805 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $338 $365 n/a
UK1805 # 08 Y:2018 08 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,637 $750 n/a
UK1805 # 09 Y:2018 09 2018 MOVE PRODUCT USING MECHANICAL MEANS $27,500 $19,000 n/a
UF0519 # 01 Y:2018 01 2018 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $27,363 $868 Implemented
UF0519 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $17,618 $30,000 Not Implemented
UF0519 # 03 Y:2018 03 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $11,657 $25,600 Not Implemented
UF0519 # 04 Y:2018 04 2018 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,569 $45,225 Implemented
UF0519 # 05 Y:2018 05 2018 ISOLATE HOT OR COLD EQUIPMENT $6,694 $2,710 Not Implemented
UF0519 # 06 Y:2018 06 2018 UPGRADE CONTROLS ON COMPRESSORS $5,422 $25,600 Not Implemented
UF0519 # 07 Y:2018 07 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,271 $25,600 Not Implemented
UF0519 # 08 Y:2018 08 2018 INSTALL COMMON HEADER ON COMPRESSORS $2,514 $3,216 Not Implemented
UF0519 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,687 $1,850 Implemented
UF0519 # 10 Y:2018 10 2018 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,226 $5,454 Not Implemented
BS0112 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,983 $1,500 Not Implemented
BS0112 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,971 $2,145 Not Implemented
BS0112 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,787 $13,000 Not Implemented
BS0112 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,785 $1,560 Not Implemented
BS0112 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $16,656 $1,031 Not Implemented
BS0112 # 06 Y:2018 06 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,051 $2,790 Not Implemented
SD0571 # 01 Y:2018 01 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $35,866 $178,055 Not Implemented
SD0571 # 02 Y:2018 02 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $20,104 $28,000 Not Implemented
SD0571 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $3,128 $939 Not Implemented
SD0571 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,822 $2,000 Not Implemented