Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0253 # 05 Y:1988 | 05 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $288 | $0 | Implemented |
KU0247 # 01 Y:1988 | 01 | 1988 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $411 | $3,100 | Not Implemented |
KU0247 # 02 Y:1988 | 02 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,591 | $0 | Implemented |
KU0247 # 03 Y:1988 | 03 | 1988 | INSTALL TURBULATORS | $1,010 | $350 | Implemented |
KU0247 # 04 Y:1988 | 04 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,305 | $0 | Implemented |
KU0247 # 05 Y:1988 | 05 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $288 | $0 | Implemented |
KU0247 # 06 Y:1988 | 06 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $331 | $55 | Not Implemented |
KU0247 # 07 Y:1988 | 07 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $390 | $705 | Implemented |
KU0244 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,442 | $9,509 | Implemented |
KU0244 # 02 Y:1988 | 02 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,665 | $0 | Implemented |
KU0244 # 03 Y:1988 | 03 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,434 | $2,355 | Not Implemented |
KU0244 # 04 Y:1988 | 04 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,359 | $2,400 | Implemented |
KU0244 # 05 Y:1988 | 05 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $404 | $125 | Implemented |
KU0244 # 06 Y:1988 | 06 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $324 | $0 | Implemented |
KU0244 # 07 Y:1988 | 07 | 1988 | INSTALL AUTOMATIC STACK DAMPER | $178 | $275 | Implemented |
KU0244 # 08 Y:1988 | 08 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $174 | $10 | Not Implemented |
KU0244 # 09 Y:1988 | 09 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $114 | $0 | Implemented |
KU0245 # 01 Y:1988 | 01 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $33,489 | $50,000 | Implemented |
KU0245 # 03 Y:1988 | 03 | 1988 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,396 | $4,000 | Implemented |
KU0245 # 04 Y:1988 | 04 | 1988 | COVER OPEN TANKS | $2,670 | $400 | Implemented |
KU0245 # 05 Y:1988 | 05 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $311 | $162 | Implemented |
KU0245 # 06 Y:1988 | 06 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $760 | $0 | Implemented |
KU0245 # 07 Y:1988 | 07 | 1988 | INSTALL TURBULATORS | $724 | $960 | Implemented |
KU0245 # 08 Y:1988 | 08 | 1988 | INSULATE BARE EQUIPMENT | $656 | $840 | Implemented |
KU0245 # 09 Y:1988 | 09 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $518 | $250 | Not Implemented |