Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0198 # 04 Y:1990 | 04 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $58,450 | $102,564 | Implemented |
MA0198 # 05 Y:1990 | 05 | 1990 | RECOVER AND REUSE COOLING WATER | $5,754 | $14,820 | Not Implemented |
MA0188 # 01 Y:1990 | 01 | 1990 | AIR CONDITION ONLY SPACE NECESSARY | $7,209 | $7,000 | Not Implemented |
MA0188 # 02 Y:1990 | 02 | 1990 | REPAIR OR REPLACE STEAM TRAPS | $4,449 | $1,600 | Implemented |
MA0188 # 03 Y:1990 | 03 | 1990 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,213 | $2,557 | Implemented |
MA0188 # 04 Y:1990 | 04 | 1990 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,823 | $185 | Implemented |
MA0188 # 05 Y:1990 | 05 | 1990 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,378 | $245 | Implemented |
MA0188 # 06 Y:1990 | 06 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $785 | $2,400 | Implemented |
MA0188 # 07 Y:1990 | 07 | 1990 | INSTALL SET-BACK TIMERS | $308 | $677 | Not Implemented |
MA0188 # 08 Y:1990 | 08 | 1990 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $215 | $545 | Implemented |
MA0191 # 01 Y:1990 | 01 | 1990 | REPAIR OR REPLACE STEAM TRAPS | $1,017 | $1,992 | Not Implemented |
MA0191 # 02 Y:1990 | 02 | 1990 | OPTIMIZE PLANT POWER FACTOR | $4,754 | $9,230 | Not Implemented |
MA0191 # 03 Y:1990 | 03 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,162 | $476 | Implemented |
MA0191 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,066 | $4,648 | Not Implemented |
MA0191 # 05 Y:1990 | 05 | 1990 | AIR CONDITION ONLY SPACE NECESSARY | $7,339 | $3,720 | Implemented |
MA0193 # 01 Y:1990 | 01 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $984 | $426 | Implemented |
MA0193 # 02 Y:1990 | 02 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,252 | $12,000 | Not Implemented |
MA0193 # 03 Y:1990 | 03 | 1990 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $40,469 | $5,400 | Implemented |
MA0193 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $173 | $348 | Not Implemented |
MA0193 # 05 Y:1990 | 05 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,037 | $2,609 | Not Implemented |
MA0193 # 06 Y:1990 | 06 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,438 | $0 | Implemented |
MA0186 # 01 Y:1990 | 01 | 1990 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,664 | $5,000 | Implemented |
MA0186 # 02 Y:1990 | 02 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,372 | $5,957 | Not Implemented |
MA0186 # 03 Y:1990 | 03 | 1990 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,848 | $500 | Implemented |
MA0186 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,333 | $9,634 | Implemented |