Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1990
Principal Product POLYSTYRENE CONTAINERS
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $1,000,000-$5,000,000
# of Employees 16
Plant Area (Sq.Ft.) 0
Annual Production 450,000,000 Pieces
Production Hrs. Annual 6,120
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,204 1,983,880 kWh $0.07
LPG $3,015 211 MMBtu $14.29
Fuel Oil #2 $18,574 4,228 MMBtu $4.39
Wood $175,499 78,011 MMBtu $2.25
TOTAL ENERGY COSTS $344,292
RECOMMENDED SAVINGS* $22,217 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage LPG Wood Electricity Usage LPG Wood
$ kWh $ MMBtu $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$583
Cost:
$381
- - - - $583 259 -
-
kWh
-
-
MMBtu
$583
259
MMBtu
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$9,178
Cost:
$2,409
- - - - $9,178 4,079 -
-
kWh
-
-
MMBtu
$9,178
4,079
MMBtu
03: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$2,531
Cost:
$559
- - $3,015 215 $(-484) (-215) -
-
kWh
$3,015
215
MMBtu
$(-484)
(-215)
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,856
Cost:
-
$1,856 - - - - - $1,856
-
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,134
Cost:
$2,460
$1,134 15,240 - - - - $1,134
15,240
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$65
Cost:
$44
$65 879 - - - - $65
879
kWh
-
-
MMBtu
-
-
MMBtu
07: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$4,435
Cost:
-
$4,435 59,789 - - - - $4,435
59,789
kWh
-
-
MMBtu
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,370
Cost:
$99
$2,370 31,946 - - - - $2,370
31,946
kWh
-
-
MMBtu
-
-
MMBtu
09: 2.6232 INSTALL SET-BACK TIMERS Savings:
$65
Cost:
$65
$65 879 - - - - $65
879
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,217
Cost:
$6,017
$9,925 108,733 $3,015 215 $9,277 4,123 $9,925
108,733
kWh
$3,015
215
MMBtu
$9,277
4,123
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage LPG Wood Electricity Usage LPG Wood