IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0186 # 02 Y:1993 02 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $33,670 $0 Implemented
AM0186 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $17,400 $68,000 Not Implemented
AM0186 # 04 Y:1993 04 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,300 $0 Not Implemented
AM0186 # 05 Y:1993 05 1993 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $7,460 $0 Implemented
AM0186 # 06 Y:1993 06 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,540 $2,000 Not Implemented
SF0003 # 01 Y:1993 01 1993 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $655 $192 Implemented
SF0003 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,485 $900 Implemented
SF0003 # 03 Y:1993 03 1993 USE OPTIMUM THICKNESS INSULATION $3,546 $4,231 Implemented
SF0003 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $453 $557 Not Implemented
SF0003 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,118 $3,875 Implemented
SF0003 # 06 Y:1993 06 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,294 $14,000 Implemented
OK0408 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,446 $1,961 Not Implemented
OK0408 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,314 $753 Not Implemented
OK0408 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $1,668 $3,528 Not Implemented
OK0408 # 04 Y:1993 04 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,789 $9,000 Not Implemented
OK0411 # 01 Y:1993 01 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,179 $946 Implemented
OK0411 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $211 $174 Implemented
OK0411 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $2,790 $3,332 Not Implemented
OK0411 # 04 Y:1993 04 1993 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $76,619 $177,000 Not Implemented
OK0411 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $198 $375 Not Implemented
OR0176 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $576 $0 Implemented
OR0176 # 02 Y:1993 02 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,144 $23,450 Not Implemented
OR0176 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $270 $0 Implemented
OR0176 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,776 $2,859 Implemented
OR0176 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,174 $9,100 Not Implemented