Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0245 # 10 Y:1988 | 10 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $499 | $0 | Implemented |
KU0245 # 11 Y:1988 | 11 | 1988 | INSTALL AUTOMATIC STACK DAMPER | $398 | $700 | Implemented |
KU0246 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,686 | $1,650 | Implemented |
KU0246 # 02 Y:1988 | 02 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $2,577 | $800 | Implemented |
KU0246 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,601 | $300 | Implemented |
KU0246 # 04 Y:1988 | 04 | 1988 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,886 | $3,600 | Implemented |
KU0246 # 05 Y:1988 | 05 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,278 | $0 | Implemented |
KU0246 # 06 Y:1988 | 06 | 1988 | INSULATE BARE EQUIPMENT | $791 | $200 | Not Implemented |
KU0246 # 07 Y:1988 | 07 | 1988 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $239 | $200 | Implemented |
KU0246 # 08 Y:1988 | 08 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $116 | $0 | Implemented |
KU0243 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,552 | $9,509 | Not Implemented |
KU0243 # 02 Y:1988 | 02 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,137 | $20,300 | Not Implemented |
KU0243 # 03 Y:1988 | 03 | 1988 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $8,418 | $4,800 | Implemented |
KU0243 # 04 Y:1988 | 04 | 1988 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $8,090 | $4,000 | Not Implemented |
KU0243 # 05 Y:1988 | 05 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $2,035 | $200 | Implemented |
KU0243 # 06 Y:1988 | 06 | 1988 | IMPROVE LUBRICATION PRACTICES | $2,035 | $0 | Implemented |
KU0243 # 07 Y:1988 | 07 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,798 | $1,320 | Implemented |
KU0243 # 08 Y:1988 | 08 | 1988 | MINIMIZE WATER USAGE | $1,298 | $1,320 | Not Implemented |
KU0243 # 09 Y:1988 | 09 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $534 | $450 | Implemented |
KU0243 # 10 Y:1988 | 10 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $454 | $0 | Not Implemented |
KU0243 # 11 Y:1988 | 11 | 1988 | USE COMPRESSOR AIR FILTERS | $128 | $0 | Implemented |
KU0242 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,183 | $6,000 | Implemented |
KU0242 # 02 Y:1988 | 02 | 1988 | REDESIGN PROCESS | $4,705 | $2,080 | Implemented |
KU0242 # 03 Y:1988 | 03 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,538 | $4,920 | Not Implemented |
KU0242 # 04 Y:1988 | 04 | 1988 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,965 | $3,600 | Implemented |