IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0111 # 03 Y:1988 03 1988 REVISE SMOKE CLEANUP FROM OPERATIONS $4,887 $17,500 Not Implemented
CO0111 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,622 $1,800 Implemented
CO0111 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,251 $600 Implemented
CO0111 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $571 $200 Implemented
CO0111 # 07 Y:1988 07 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,440 $800 Not Implemented
CO0111 # 08 Y:1988 08 1988 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,950 $5,900 Not Implemented
CO0111 # 09 Y:1988 09 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,590 $3,500 Implemented
CO0111 # 10 Y:1988 10 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,867 $1,200 Implemented
CO0111 # 11 Y:1988 11 1988 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,569 $250 Implemented
CO0111 # 12 Y:1988 12 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,844 $4,050 Implemented
GT0336 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,025 $19,500 Implemented
GT0336 # 02 Y:1988 02 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228 $228 Not Implemented
GT0336 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,130 $0 Implemented
GT0336 # 04 Y:1988 04 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,790 $1,600 Not Implemented
GT0336 # 05 Y:1988 05 1988 REDESIGN PROCESS $2,610 $2,100 Implemented
KU0242 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,183 $6,000 Implemented
KU0242 # 02 Y:1988 02 1988 REDESIGN PROCESS $4,705 $2,080 Implemented
KU0242 # 03 Y:1988 03 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,538 $4,920 Not Implemented
KU0242 # 04 Y:1988 04 1988 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,965 $3,600 Implemented
KU0242 # 05 Y:1988 05 1988 REDESIGN PROCESS $1,692 $1,200 Not Implemented
KU0242 # 06 Y:1988 06 1988 INSTALL AUTOMATIC STACK DAMPER $1,519 $1,800 Implemented
KU0242 # 07 Y:1988 07 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,236 $1,500 Implemented
KU0242 # 08 Y:1988 08 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $928 $0 Implemented
KU0242 # 09 Y:1988 09 1988 IMPROVE LUBRICATION PRACTICES $788 $0 Not Implemented
KU0242 # 10 Y:1988 10 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $500 Implemented