IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0055 # 11 Y:1992 11 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,265 $3,424 Not Implemented
AS0056 # 01 Y:1992 01 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $50,496 $337,500 Not Implemented
AS0056 # 02 Y:1992 02 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $23,380 $240,000 Not Implemented
AS0056 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,081 $43,663 Not Implemented
AS0056 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,817 $0 Not Implemented
AS0056 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $200 Not Implemented
AS0056 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $705 $5,815 Not Implemented
AS0056 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,887 $4,292 Not Implemented
AS0056 # 08 Y:1992 08 1992 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $994 $0 Not Implemented
RU0147 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $91 Implemented
RU0147 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $385 $217 Implemented
RU0147 # 03 Y:1992 03 1992 IMPROVE LUBRICATION PRACTICES $2,672 $800 Not Implemented
RU0147 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,840 $0 Implemented
RU0147 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,071 $479 Implemented
RU0148 # 01 Y:1992 01 1992 INSTALL EFFICIENT RECTIFIERS $29,457 $65,000 Not Implemented
RU0148 # 02 Y:1992 02 1992 IMPROVE LUBRICATION PRACTICES $5,460 $800 Not Implemented
RU0148 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,308 $200 Not Implemented
RU0148 # 04 Y:1992 04 1992 OPTIMIZE PLANT POWER FACTOR $10,295 $180 Not Implemented
RU0148 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,845 $233 Not Implemented
RU0148 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $461 $392 Not Implemented
RU0148 # 07 Y:1992 07 1992 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,035 $12,250 Not Implemented
RU0148 # 08 Y:1992 08 1992 OPTIMIZE PLANT POWER FACTOR $4,107 $14,279 Not Implemented
RU0148 # 09 Y:1992 09 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,993 $2,564 Not Implemented
RU0148 # 10 Y:1992 10 1992 AIR CONDITION ONLY SPACE NECESSARY $627 $1,650 Not Implemented
RU0149 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $216 $2,016 Not Implemented